HORIZON
Share

SATGURU N M ENCLAVE

P-OTH-26-6526 · RERA Madhya Pradesh · https://gethorizon.in/projects/satguru-n-m-enclave-juni-indore-cgqtab57

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Project name
SATGURU N M ENCLAVE
Units
4 flats

Timeline

Project startedNov 2025
RERA registeredMay 2026
Proposed completionSep 2028
TodaySep 2026
02

Builder’s track record

RERA Madhya Pradesh · Builder registration

D. S. WAREHOUSING AND INFRASTRUCTURE PRIVATE LIMITED

CompanyPromoter type
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Indore
Tehsil
Juni Indore
Planning area
Other
Address
Khasra 28/1/2, 29/3/1/2/3, 30/3 & 31/2/2 at Village – Limbodi, Tehsil & District – Indore (M.P.)
What’s nearby
SchoolsNearest school 1.0km away · Library 1.3km away
HealthcareHospital 629m away · 3 clinics within 1km · Pharmacy within 500m
LifestyleNo parks within 2km · Gym or sports centre 881m away · 7 restaurants and cafes within 1km
ShoppingSupermarket 603m away
Getting around
Expressway 2.0 kmPrimary road 596 m · Shaheed Tantiya Bhil RoadRailway line 5.0 km · Mhow IndoreNo metro or railway within 5kmBus stop within 1km
Water & environment
Water body 1.5 km · Limbodi PondCanal 1.5 km · Bilawali-Limbodi Pond Canal
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹107.64 Cr declared to build 4 flats. What that works out to:

₹26.91 Crdeclared cost per flatall-in — land + construction
7%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹15,050per sq yd
₹18,000per sq m
Which rate
multi-storey residential
Matched to
The middle rate of the 122 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

SAHIB RESORTS (LIMBODI)₹19,000 / sq m₹15,886 / sq yd180 m
BRAJNAYNI COLONY (LIMBODI)₹20,000 / sq m₹16,723 / sq yd210 m
LIMBODI (KHANDAVA ROAD CHODKAR)₹22,500 / sq m₹18,813 / sq yd230 m
SHANTI DHAM (LIMBODI)₹21,000 / sq m₹17,559 / sq yd260 m
SARTHAK RESIDENCY (LIMBODI)₹20,000 / sq m₹16,723 / sq yd260 m

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan
Building Permitapproved 29 May 2026 · 4 mo ago
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

109 residential projects still under way within 25 km. Step out ring by ring:

2 projects within 3 km — showing the nearest 2.

IndoreApartment

METRO CORPORATES

ADITYA CORPORATES

May 2026registered
Jun 2028target completion
Declared cost₹24.28 CrScale33 flatsAuthorityRERA Madhya Pradesh
IndoreApartment

BLOCK NO.17- SILVER LEAVES

SILVER REALTIES AND INFRASTRUCTURE PRIVATE LIMITED

Sep 2023registered
Mar 2026target completion
Declared cost₹18.58 CrScale54 flatsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.