The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 597m away · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 183 mNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 142 mCanal 550 m · Omkareshwar Right Bank Canal
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹2.39 Cr declared to build 50 plots. What that works out to:
₹4.79 Lakhdeclared cost per plotall-in — land + construction
42%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
MP Department of Registration & Stamps
In Madhya Pradesh it’s called the collector guideline rate.
₹4,181per sq yd
₹5,000per sq m
Which rate
open plot, residential
Matched to
The rate published for “Shubham Colony”, 470 m from this project.
In force
2026-2027 schedule · effective Apr 2026
Colonies around this project
SHIV RESIDANCY
₹5,500 / sq m
₹4,599 / sq yd
550 m
SINGHANA ROAD PAR
₹17,500 / sq m
₹14,632 / sq yd
670 m
RUKMANI RESIDENCY ROAD SE ANDAR
₹7,500 / sq m
₹6,271 / sq yd
850 m
RUKMANI RESIDENACY ROAD PAR
₹8,000 / sq m
₹6,689 / sq yd
850 m
SINGHANA ROAD SE ANDAR
₹12,000 / sq m
₹10,034 / sq yd
1.0 km
The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.
What this number is — and isn’t
The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Madhya Pradesh · Approved building plan
Dhar
Town & Country Planning (DTCP)
Layout Permitapproved 13 May 2024 · 2 yrs ago
The promised possession date (30 May 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Dhar
Town & Country Planning area · Dhar district
Has approved 24 RERA projects — 0.5% of Madhya Pradesh.
a plotted-layout market — 13% apartments · 87% plotted layouts. Your plotted layout is this body's core business.
Builders
22
On record
322 flats · 3,034 plots
Reach
5 tehsils
Since
2017
More layout-heavy than Madhya Pradesh overall — 87% plots here vs 72% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Madhya Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Madhya Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Madhya Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Madhya Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
20 plotted projects still under way within 25 km. Step out ring by ring:
18 projects between 10 and 20 km — showing the nearest 6.