HORIZON
Share

SHIVAM PLAZA

P-HRD-17-1058 · RERA Madhya Pradesh · https://gethorizon.in/projects/shivam-plaza-harda-o5j0pf2a

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Project name
SHIVAM PLAZA
Units
34 units
Unit mix
18 × Shops · 16 × Flats
Revised completion
30 Sep 2021extended after an approved RERA extension
Extensions
2 approved · Covid19completion-date extension(s) granted by RERA
Quarterly reports
7 on file · latest Oct 2017 - Dec 2017quarterly progress certificates filed with RERA

Timeline

Project startedJan 1970
RERA registeredNov 2017
Proposed completionDec 2020
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

34 units across 2 batches
TypeArea sq mCount
Flats16
Shops18

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Madhya Pradesh · Builder registration

NAVNEET LAL PATEL

IndividualPromoter type
1Projects
1City
2017–2020Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Harda
Tehsil
Harda
Planning area
Harda
Address
Khasra No. 196, PH no. 49/25, Gram Kulharda, Tehsil & Dist. Harda
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 429m away · 2 clinics within 1km · Pharmacy within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 439 mPrimary road 1.1 km · NATIONAL HIGHWAY 47Railway line 1.5 kmRailway station 1.5km away (Harda)Limited bus connectivity nearby
Water & environment
Water body 1.3 km · PAANI KI TANKIRiver 1.4 km · Ajnal
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹1.49 Cr declared to build 34 flats. What that works out to:

₹4.37 Lakhdeclared cost per flatall-in — land + construction
0%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹19,231per sq yd
₹23,000per sq m
Which rate
RCC construction
Matched to
The middle rate of the 237 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

N.H. 59A INDORE ROAD PAR PRATAP TAKIZ SE MULLA JI KE NALE TAK₹43,000 / sq m₹35,953 / sq yd160 m
N.H. 59A/BAYPAS ROAD EVAM GOLAPURA ROAD SE ANDAR₹20,000 / sq m₹16,723 / sq yd240 m
NH 59A INDORE ROAD PAR HANUMAN MANDIR SE MULLA JI KE NALE TAK₹43,000 / sq m₹35,953 / sq yd240 m
N.H. 59A INDORE ROAD PAR HANUMAN MANDIR SE CMO QUARTAR TAK₹43,000 / sq m₹35,953 / sq yd240 m
GOLAPURA ROAD PAR EVAM HANUMAN MANDIR SE KHANDWA BAYPAS ROAD KE DONO TARAF₹23,000 / sq m₹19,231 / sq yd250 m

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Harda

Town & Country Planning (DTCP)
Building Permit

The promised possession date (31 Dec 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Harda

Town & Country Planning area · Harda district

Has approved 46 RERA projects0.9% of Madhya Pradesh.

a plotted-layout market7% apartments · 93% plotted layouts. Apartments like yours are the smaller share here — this body mostly approves plotted layouts.

Builders
36
On record
308 flats · 5,666 plots
Reach
4 tehsils
Since
2017

More layout-heavy than Madhya Pradesh overall — 93% plots here vs 72% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

No other commercial projects still under way are on the record within 25 km.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.