The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
ORERA · Registration filing
District
Koraput
Pincode
764001
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.2km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingSupermarket 1.9km away
Getting around
Expressway 688 mRailway line 1.8 kmRailway station 3.0km away (Jeypore)Limited bus connectivity nearbyAirport 1.8km away
Water & environment
Canal 608 mRiver 1.2 km
distances only — not a flood assessment
Land, title & encumbrance
Land parcels2 parcels · 324 sq m total
VillageJEYPUR
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Location — done
04
Government Guidance Rate
Odisha IGR — benchmark valuation
In Odisha it’s called the benchmark value.
₹4,008per sq yd
₹4,794per sq m
Which rate
residential
Matched to
The rate published for the village of “JEYPORE L.R”.
What this number is — and isn’t
The minimum value Odisha’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
ORERA · Approved building plan
Special Planning Authority, Jeypore
Building Permit
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
The approving authority
The body that approved this project (a Special Planning Authority, Regional Improvement Trust or gram panchayat). It has approved 110 RERA projects across 17 pincodes — about 1 in 11 in Odisha.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
ORERA · public record
Complaints register
Not published. ORERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to ORERA
Litigation
None declared in this filing
Only what the builder declared, or what ORERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with ORERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within Koraput
2 residential projects still under way within Koraput. Step out ring by ring: