140 × LIG 2 BKH (Block A) · 110 × EWS 1 BHK (Block C)
Carpet area
25–39 sq mper-type range, as filed
Land area
10,060 sq m
Completion deadline extended
3 extensions on record — latest to 30 Jun 2025declared reason: force majeure
Description
Firm shall apply for the revision of maps
The following details have been submitted by the developers After receiving the revised maps have been approved by JDA.
The details of previous approved & revised approval is as follows:
Block -A Previously approved maps(G+4) Revised approved maps(G+4)
LIG Apartments 0 140
Two Wheeler Parking 0 280
Block -B Previously approved maps(G+4) Revised approved maps(G+4)
LIG Apartments 208 SAME AS PER OLD
EWS Apartments 40 SAME AS PER OLD
Two Wheeler Parking 456 SAME AS PER OLD
Block -C Previously approved maps(G+4) Revised approved maps(G+4)
EWS Apartments 110 SAME AS PER OLD
Two Wheeler Parking 110 SAME AS PER OLD
Commercial Car Parking 0 4
Com. Two Wheeler Parking 0 3
The maps approved on Dated 06.06.2017 Have been attetched with approved letter under copy of layout approval and building plan approval.
The Revised maps approved on Dated 04.12.2017 Have been attetched with approved letter under Other approval as may be required and obtained for the project.
The above mentioned details are being added on 27.02.2018
Timeline
RERA registeredSep 2017
Proposed completionJun 2022
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
250 units across 2 batches
BuildingTypeArea sq mCount
SHREE AASHRYA EMERALDLIG 2 BKH (Block A)39140
SHREE AASHRYA EMERALDEWS 1 BHK (Block C)25110
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
LifestyleNo parks within 2km · Gym or sports centre 1.3km away
ShoppingNo supermarket within 2km
Getting around
Expressway 1.4 kmNo metro or railway within 5kmLimited bus connectivity nearby
Price analysisdeclared build cost — not a sale price
₹24.75 Cr declared to build 250 flats. What that works out to:
₹9.90 Lakhdeclared cost per flatall-in — land + construction
₹1,921/sq ftof built-up area₹20,672/sq m
11%of the cost is land₹254/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 5 Sep 2017 · 9 yrs ago
The promised possession date (30 Jun 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
416 residential projects still under way within 25 km. Step out ring by ring: