Complete project overview
RAJ-RERA · Registration filing- Units
- 499 units
- Mix
- 399 × LIG-2BHK · 100 × EWS-1BHK
- Carpet area
- 28–48 sq mper-type range, as filed
- Land area
- 12,550 sq m
- Completion deadline extended
- 3 extensions on record — latest to 14 Jun 2025declared reason: other than force majeure
- Description
- 1.Since our project is new therefore we have not appointed contractor,engineer and other consultants and as soon as we appoint such professionals then we will provide information of same to authority.2.Building Sanction drawing is uploaded under copy of Layout approval & Building document, the same has been scanned to our best ability however, in case of any non-visibility the same set of all sanction drawings can be downloaded and viewed. In addition to this true copy of Architecture drawing submitted to the concerned authority for approval signed & sealed by Architect has also been uploaded under the head of architectural drawing where in the same can be downloaded for more visibility.3.The floor plan for block-A in building sanction drawing- Sheet-3(1st to 4th floor plan) and Sheet-4(2nd to 4th floor) is same in all respect and same should not be confused, wherein the same can be viewed on building sanction drawing or copy of layout approval under document.Further Building sanction drawing are uploaded under Building in Electrical drawing-Site Plan,In Services- Typical Floor Plan 1st to 4th floor,In structural drawing-Typical Floor plan 2nd to 4th floor in Block-A and Terrace Plan,In Fire fighting-Elevation of Block-B and Elevation of Block-C,In Electrical-Floor Plan 1st to 4th Floor(Block-A,B,C),In Common Plumbing- Section for Block-A,B,C and Elevation for Block-A
Timeline
Find your flat
Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Builder’s track record
RAJ-RERA · Promoter registrationSHRI SHANTINATH BUILDCON
The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Location & price analysis
RAJ-RERA · Registration filing- Address
- 1943,6455/1944,6456/1945,6831/1943,6833/6456,6904/1944,6906/1945, Situated at near chamunda garden,swaroopura road, Jalor, Jalor, 343001
- Taluka
- Jalor
- District
- Jalor
- Pincode
- 343001
₹50.80 Cr declared to build 499 flats. What that works out to:
This is what the promoter filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Planning authority
RAJ-RERA · Approved building planThe promised possession date (14 Jun 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.
What this record cannot tell you
- Build quality — no filing records how well it was actually built.
- Private disputes — only complaints escalated to the authority appear here.
- What it will be worth — the record is the past; it does not price the future.
- Construction progress — RAJ-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
- Complaints — RAJ-RERA does not publish a complaints register. This read cannot speak to them either way.