01

Complete project overview

RERA Madhya Pradesh · Registration filing
Units
23 flats
Revised completion
26 Feb 2026extended after an approved RERA extension
Extensions
1 approved · Normalcompletion-date extension(s) granted by RERA
Quarterly reports
5 on file · latest Apr 2025 - Jun 2025quarterly progress certificates filed with RERA

Timeline

Project startedJan 2023
RERA registeredJan 2023
Proposed completionFeb 2025
TodaySep 2026
02

Builder’s track record

RERA Madhya Pradesh · Builder registration

HIRA NAND CHATWANI

IndividualPromoter type
1Projects
1City
2023–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Ujjain
Tehsil
Ujjain
Planning area
Other
Address
GRAM HAKKANIPURA, UJJAIN(M.P.)
What’s nearby
SchoolsNo schools within 2km · College or university 1.3km away
HealthcareHospital 1.7km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.3 km · Ujjain Ring RoadPrimary road 1.2 kmRailway line 2.8 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 1.4 kmWater body 3.1 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹1.82 Cr declared to build 23 flats. What that works out to:

₹7.89 Lakhdeclared cost per flatall-in — land + construction
48%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹13,044per sq yd
₹15,600per sq m
Which rate
RCC construction
Matched to
The middle rate of the 150 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

HAKKANIPURA ROAD SE ANDER₹22,000 / sq m₹18,395 / sq yd520 m
KRISHNA VIHAR₹24,000 / sq m₹20,067 / sq yd600 m
HAKKANIPURA SADAK₹22,500 / sq m₹18,813 / sq yd680 m
krishna velly colony₹24,000 / sq m₹20,067 / sq yd1.0 km
MAHAVEER NAGAR (HAKKANIPURA)₹10,600 / sq m₹8,863 / sq yd1.1 km

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan
Building Permit

The promised possession date (26 Feb 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

4 residential projects still under way within 25 km. Step out ring by ring:

3 projects between 3 and 6 km — showing the nearest 3.

UjjainApartment

VDS PRIME PLAZA PHASE A

VDS ENTERPRISES LLP

Apr 2024registered
Jun 2026target completion
Declared cost₹3.66 CrScale6 flatsAuthorityRERA Madhya Pradesh
UjjainApartment

VDS PRIME PLAZA PHASE B

VDS ENTERPRISES LLP

Apr 2024registered
Jun 2026target completion
Declared cost₹3.67 CrScale6 flatsAuthorityRERA Madhya Pradesh
UjjainIndividual houses

KANTI PARADISE

SHRI SAI KRIPA DEVELOPERS

May 2026registered
Aug 2028target completion
Declared cost₹9.20 CrScale26 flatsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.