Complete project overview

RERA Telangana · Registration filing
Units
290 units
Unit mix
272 × 3BHK, 18 × 4BHK
Saleable area
136–273 sq mper unit, as filed
Floors
20
Land area
8,567 sq m
Built-up area
47,558 sq m

Timeline

RERA approvedJan 2025
Proposed completionJan 2030
TodayJul 2026
Construction progress

12.5% overall, as filed

Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Basement & plinth15%
Podiums15%
Excavation95%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

290 of 290 available
BuildingFloorTypeArea sq mAvailable
SRI TIRUMALA FORTUNE PHASE-113BHKmortgaged1881 of 1
SRI TIRUMALA FORTUNE PHASE-113BHKmortgaged1642 of 2
SRI TIRUMALA FORTUNE PHASE-113BHKmortgaged1591 of 1
SRI TIRUMALA FORTUNE PHASE-113BHKmortgaged1541 of 1
SRI TIRUMALA FORTUNE PHASE-113BHKmortgaged1491 of 1
SRI TIRUMALA FORTUNE PHASE-124BHKmortgaged2371 of 1
SRI TIRUMALA FORTUNE PHASE-123BHKmortgaged1405 of 5
SRI TIRUMALA FORTUNE PHASE-123BHKmortgaged1361 of 1
SRI TIRUMALA FORTUNE PHASE-123BHKmortgaged1642 of 2
SRI TIRUMALA FORTUNE PHASE-123BHKmortgaged1591 of 1
SRI TIRUMALA FORTUNE PHASE-123BHKmortgaged1491 of 1
SRI TIRUMALA FORTUNE PHASE-123BHKmortgaged1881 of 1
SRI TIRUMALA FORTUNE PHASE-123BHKmortgaged1531 of 1
SRI TIRUMALA FORTUNE PHASE-123BHKmortgaged2021 of 1
SRI TIRUMALA FORTUNE PHASE-123BHKmortgaged1541 of 1
SRI TIRUMALA FORTUNE PHASE-133BHKmortgaged1561 of 1
SRI TIRUMALA FORTUNE PHASE-133BHKmortgaged2011 of 1
SRI TIRUMALA FORTUNE PHASE-133BHKmortgaged2121 of 1
SRI TIRUMALA FORTUNE PHASE-133BHKmortgaged1801 of 1
SRI TIRUMALA FORTUNE PHASE-133BHKmortgaged1781 of 1
SRI TIRUMALA FORTUNE PHASE-133BHKmortgaged2051 of 1
SRI TIRUMALA FORTUNE PHASE-134BHKmortgaged2731 of 1
SRI TIRUMALA FORTUNE PHASE-133BHKmortgaged1615 of 5
SRI TIRUMALA FORTUNE PHASE-133BHKmortgaged1701 of 1
SRI TIRUMALA FORTUNE PHASE-133BHKmortgaged1681 of 1
SRI TIRUMALA FORTUNE PHASE-133BHKmortgaged2081 of 1
SRI TIRUMALA FORTUNE PHASE-143BHKmortgaged2051 of 1
SRI TIRUMALA FORTUNE PHASE-143BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-144BHKmortgaged2731 of 1
SRI TIRUMALA FORTUNE PHASE-143BHKmortgaged1615 of 5
SRI TIRUMALA FORTUNE PHASE-143BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-143BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-143BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-143BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-143BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-143BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-143BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-154BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-153BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-153BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-153BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-153BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-153BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-153BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-153BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-153BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-153BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-153BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-163BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-164BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-163BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-163BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-163BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-163BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-163BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-163BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-163BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-163BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-163BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-173BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-173BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-173BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-173BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-173BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-173BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-173BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-173BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-173BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-173BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-174BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-183BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-184BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-183BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-183BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-183BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-183BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-183BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-183BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-183BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-183BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-183BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-193BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-194BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-193BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-193BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-193BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-193BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-193BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-193BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-193BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-193BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-193BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-1103BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-1104BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-1103BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-1103BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-1103BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-1103BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-1103BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-1103BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-1103BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-1103BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-1103BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-1113BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-1113BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-1113BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-1113BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-1113BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-1113BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-1113BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-1113BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-1113BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-1114BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-1113BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-1124BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-1123BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-1123BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-1123BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-1123BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-1123BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-1123BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-1123BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-1123BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-1123BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-1123BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-1133BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-1134BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-1133BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-1133BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-1133BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-1133BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-1133BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-1133BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-1133BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-1133BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-1133BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-1143BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-1144BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-1143BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-1143BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-1143BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-1143BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-1143BHK1791 of 1
SRI TIRUMALA FORTUNE PHASE-1143BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-1143BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-1143BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-1143BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-1153BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-1154BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-1153BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-1153BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-1153BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-1153BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-1153BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-1153BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-1153BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-1153BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-1153BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-1163BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-1164BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-1163BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-1163BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-1163BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-1163BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-1163BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-1163BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-1163BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-1163BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-1163BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-1173BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-1174BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-1173BHK1611 of 1
SRI TIRUMALA FORTUNE PHASE-1173BHK1614 of 4
SRI TIRUMALA FORTUNE PHASE-1173BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-1173BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-1173BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-1173BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-1173BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-1173BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-1173BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-1173BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-1183BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-1184BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-1183BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-1183BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-1183BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-1183BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-1183BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-1183BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-1183BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-1183BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-1183BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-1193BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-1193BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-1193BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-1193BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-1193BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-1193BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-1193BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-1193BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-1193BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-1193BHK2081 of 1
SRI TIRUMALA FORTUNE PHASE-1203BHK2051 of 1
SRI TIRUMALA FORTUNE PHASE-1204BHK2731 of 1
SRI TIRUMALA FORTUNE PHASE-1203BHK1615 of 5
SRI TIRUMALA FORTUNE PHASE-1203BHK1561 of 1
SRI TIRUMALA FORTUNE PHASE-1203BHK2011 of 1
SRI TIRUMALA FORTUNE PHASE-1203BHK2121 of 1
SRI TIRUMALA FORTUNE PHASE-1203BHK1801 of 1
SRI TIRUMALA FORTUNE PHASE-1203BHK1781 of 1
SRI TIRUMALA FORTUNE PHASE-1203BHK1701 of 1
SRI TIRUMALA FORTUNE PHASE-1203BHK1681 of 1
SRI TIRUMALA FORTUNE PHASE-1203BHK2081 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

ENGINEERS ASSOCIATES PRIVATE LIMITED

CompanyPromoter type
Hyderabad, TelanganaBased in
5Projects
2Cities
2019–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
926 homeson the public record across 5 projects
1,27,902 sq mbuilt-up filed
36,843 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Greater Hyderabad Municipal Corporation (GHMC)Municipal / Corporation4 of 5 projects
Hyderabad Metropolitan Development Authority (HMDA)Urban Development Authoritythis project1 of 5 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Telangana · Registration filing
Locality
Thukkuguda
Village
Srinagar
Mandal
Maheshwaram
District
Ranga Reddy
Pincode
501359
North boundary
150 feet wide road
East boundary
Land in Survey No 189
South boundary
Land in Survey No 190
West boundary
Land in Survey No 192
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 288m away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · ATM within 500m
Getting around
Expressway 73 mPrimary road 4.2 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Canal 576 mWater body 2.4 km
distances only — not a flood assessment
Government land classification

Land here includes House Sites (residential), plus Dry land, Wet Land double crop, Land abutting NH/SH/ZPP/MPP. The state classes land per survey— confirm your plot’s survey number is House Sites.

Telangana Registration & Stamps
Declared external development
Water supply8%
Roads0%
Sewerage (Chamber,…0%
Rainwater0%
Green Strip/TOT LO…0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Rainwater0%
Renewable energy0%
Fire safety0%
Electricity0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisno declared cost on this filing — one government benchmark below

This state’s RERA filing carries no declared build cost at all — nothing to turn into a per-unit or per-sq-ft figure here. The one real, government-sourced number below is the closest thing to a benchmark this record can offer.

Government guidance value
₹1,100/sq ydHouse Sites

₹1,316/sq m · effective Jan 2013

The state’s minimum value for this village’s land, set for stamp duty — a floor, not a market price. Source: Telangana Registration & Stamps.

04

Planning authority

RERA Telangana · Approved building plan

Hyderabad Metropolitan Development Authority (HMDA)

Urban Development Authority
Building Permit no. 009496/BP/HMDA/2440/SMD/2024Survey no. 189/P
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan 009496/BP/HMDA/2440/SMD/2024 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

HMDA

Urban Development Authority · Hyderabad metropolitan periphery

Has approved 3,643 RERA projectsabout 1 in 3 in Telangana.

an apartments market72% apartments · 28% plotted layouts. Apartments like yours are this body's core business.

Builders
2,462
On record
3,98,695 flats · 1,96,015 plots
Reach
71 mandals
Since
2016

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.