HORIZONMarkets
01

Complete project overview

RERA Telangana · Registration filing
Units
10 units
Unit mix
10 × 3BHK
Saleable area
142 sq mper unit, as filed
Floors
5
Land area
520 sq m
Built-up area
1,289 sq m

Timeline

RERA approvedNov 2018
Proposed completionDec 2021
TodayJul 2026
Construction progress

80% overall, as filed

Basement & plinth0%
Podiums0%
Excavation100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

0 of 10 available
BuildingFloorTypeArea sq mAvailable
THIRUMALAVASAM WEST BLOCK13BHK1420 of 2
THIRUMALAVASAM WEST BLOCK23BHK1420 of 2
THIRUMALAVASAM WEST BLOCK33BHK1420 of 2
THIRUMALAVASAM WEST BLOCK43BHK1420 of 2
THIRUMALAVASAM WEST BLOCK53BHK1420 of 2

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

RERA Telangana · Promoter registration

SRI R.S.CONSTRUCTIONS

PartnershipPromoter type
Hyderabad, TelanganaBased in
2Projects
1City
2018–2021Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
20 homeson the public record across 2 projects
2,578 sq mbuilt-up filed
1,040 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

RERA Telangana · Registration filing
Locality
BEERAMGUDA
Village
AMEENAPUR
Mandal
AMEENPUR
District
Sangareddy
Pincode
502032
North boundary
PLOT No 85
East boundary
PLOT No 69 AND 70
South boundary
PLOT No 82
West boundary
12 M ROAD
What’s nearby
Schools1 school within 1km
HealthcareHospital 1.4km away · Clinic within 2km
LifestylePark 1.5km away · Gym or sports centre 1.6km away · 3 restaurants and cafes within 1km
ShoppingSupermarket 1.8km away
Getting around
Expressway 1.6 kmPrimary road 2.5 kmRailway line 3.3 kmRailway station 3.5km away (Ramachandrapuram TS)Limited bus connectivity nearby
Water & environment
Water body 824 m · BANDAMKOMMU LAKE
distances only — not a flood assessment
Government land classification

No residential (House Sites) class on record. The state classes this village’s land as Dry land, Wet Land double crop. If it’s sold as residential plots, verify the layout’s conversion / approval.

Telangana Registration & Stamps
Declared external development
Water supply100%
Sewerage (Chamber,…100%
Green Strip/TOT LO…100%
Rainwater100%
Electricity100%
Roads0%
Rainwater0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Renewable energy0%
Fire safety0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
04

Planning authority

RERA Telangana · Approved building plan

Hyderabad Metropolitan Development Authority (HMDA)

Urban Development Authority
Building Permit
Survey no. 941/E10, 941/E, 941 & 946/3

The promised possession date (27 Dec 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

HMDA

Urban Development Authority · Hyderabad metropolitan periphery

Has approved 3,643 RERA projectsabout 1 in 3 in Telangana.

an apartments market72% apartments · 28% plotted layouts. Apartments like yours are this body's core business.

Builders
2,462
On record
3,98,695 flats · 1,96,015 plots
Reach
71 mandals
Since
2016

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.