Complete project overview
GujRERA · Registration filing- Units
- 37 units
- Mix
- 37 × Residential
- Carpet area
- 51–107 sq mper-unit range, as filed
- Blocks
- 3
- Parking
- 16 spaces
- Land area
- 2,476 sq m
Timeline
81% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.Find your flat
Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Builder’s track record
GujRERA · Promoter registrationTULSI HOUSE
The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Location & price analysis
GujRERA · Registration filing- Taluka
- Rajkot
- District
- Rajkot
- Address
- Tulsi House,Ghanteshwar Survey No 75P1P1, Plot No 46 to 55 Near Jalaram Mandir, Jamnagar Road
₹5.69 Cr declared to build 37 flats. What that works out to:
This is what the promoter filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Planning authority
GujRERA · Approved building planThe promised possession date (30 Sep 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
1 of 3 blocks carry a Building-Use (BU) permission (latest 18 Jan 2024)— Gujarat’s legal-to-occupy sign-off. The remaining blocks are not shown as BU-cleared here; treat those as not-yet-occupiable until confirmed.
The approving authority
The body that sanctioned this project. It has approved 2,653 RERA projects across 26 talukas — about 1 in 6 in Gujarat.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
What this record cannot tell you
- Build quality — no filing records how well it was actually built.
- Private disputes — only complaints escalated to the authority appear here.
- What it will be worth — the record is the past; it does not price the future.
- Complaints — GujRERA does not publish a complaints register. This read cannot speak to them either way.