HPRERASIR2026184/P · HP RERA · https://gethorizon.in/projects/vidya-nagar-ponta-sahib-smhdxscy
01
Complete project overview
HP RERA · Registration filing
Project name
VIDYA NAGAR
Inventory
4 plots filed
Declared completion period
3 years 0 monthsduration from approval, as filed — no start date is on record
Registration valid until
3 Aug 2029
Description
Resi.Plots at Bherewala
Not provided by the promoter
Septic Tank and Soak Pit, Individual Water Harvesting Tanksite infrastructure the promoter declared is another party's responsibility — confirm who delivers it
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
4 plots across 3 batches
TypeArea sq mCount
Residential Plot1892
Residential Plot1681
Residential Plot1771
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 242 mNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 1.6 kmCanal 2.0 km
distances only — not a flood assessment
Land, title & encumbrance
Land parcelMohal/Mauza Bherewala · Tehsil Ponta Sahib · Khasra 249/60/2
Buyer to arrangeSeptic Tank and Soak Pit, Individual Water Harvesting Tank
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Location — done
04
Government Guidance Rate
Himachal Pradesh registration department
In Himachal Pradesh it’s called the circle rate.
No government guidance rate is shown for this project.
Himachal Pradesh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan HPTCP11202506429 on the approving authority’s portal to confirm the approval.