Complete project overview

RERA Telangana · Registration filing
Units
25 units
Unit mix
20 × 2BHK, 5 × 3BHK
Saleable area
112–144 sq mper unit, as filed
Floors
5
Land area
1,285 sq m
Built-up area
2,660 sq m

Timeline

RERA approvedOct 2021
Proposed completionOct 2027
TodayJul 2026
Construction progress

100% overall, as filed

Excavation100%
Basement & plinth100%
Podiums100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

25 of 25 available
BuildingFloorTypeArea sq mAvailable
VSR RESIDENCY13BHK1441 of 1
VSR RESIDENCY12BHK1123 of 3
VSR RESIDENCY12BHK1151 of 1
VSR RESIDENCY23BHKmortgaged1441 of 1
VSR RESIDENCY22BHK1123 of 3
VSR RESIDENCY22BHK1151 of 1
VSR RESIDENCY33BHK1441 of 1
VSR RESIDENCY32BHK1123 of 3
VSR RESIDENCY32BHK1151 of 1
VSR RESIDENCY43BHK1441 of 1
VSR RESIDENCY42BHK1123 of 3
VSR RESIDENCY42BHK1151 of 1
VSR RESIDENCY53BHK1441 of 1
VSR RESIDENCY52BHK1123 of 3
VSR RESIDENCY52BHK1151 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

V R CONSTRUCTIONS

PartnershipPromoter type
Warangal Urban, TelanganaBased in
6Projects
4Cities
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
102 homeson the public record across 6 projects
9,921 sq mbuilt-up filed
4,246 sq mland declared
₹4.72 Crdeclared build cost

Build cost is what the promoter declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Directorate of Town & Country Planning (DTCP)Town & Country Planning (DTCP)this project3 of 5 projects
Director, Town and Country PlanningTown & Country Planning (DTCP)1 of 5 projects
Vice Chairman, UDAUrban Development Authority1 of 5 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

RERA Telangana · Registration filing
Locality
HUNTER ROAD
Village
GMH Hanmakonda
Mandal
Hanamkonda
District
Warangal Urban
Pincode
506001
North boundary
OPEN PLOT
East boundary
9M WIDE ROAD
South boundary
OPEN PLOT
West boundary
OPEN PLOT
What’s nearby
SchoolsNearest school 1.4km away · College or university 1.7km away
HealthcareHospital 1.5km away · Clinic within 2km
LifestylePark 1.7km away · Swimming pool within 2km
ShoppingSupermarket 1.7km away · Mall 1.9km away
Getting around
Expressway 2.0 kmPrimary road 1.5 kmRailway line 1.8 kmRailway station 4.1km away (Warangal)Limited bus connectivity nearby
Water & environment
Water body 361 mRiver 1.1 km
distances only — not a flood assessment
Declared external development
Roads100%
Water supply100%
Sewerage (Chamber,…100%
Rainwater100%
Green Strip/TOT LO…100%
Street lighting100%
Rainwater100%
Electricity100%
Aggregate area of …100%
Community Building…0%
Sewage0%
Solid waste0%
Renewable energy0%
Fire safety0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
04

Planning authority

RERA Telangana · Approved building plan

Directorate of Town & Country Planning (DTCP)

Town & Country Planning (DTCP)
Building Permit
Survey no. 100-A
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

DTCP

Town & Country Planning · towns & district HQs across Telangana

Has approved 3,737 RERA projectsabout 1 in 3 in Telangana, more than any other body in the state.

a plotted-layout market32% apartments · 68% plotted layouts. Apartments like yours are the smaller share here — this body mostly approves plotted layouts.

Builders
2,933
On record
41,686 flats · 4,33,404 plots
Reach
287 mandals
Since
2012

More layout-heavy than Telangana overall — 68% plots here vs 34% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.