HORIZON
Share

Developer · builder dossier

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED

Bihar · Jharkhand · Uttar Pradesh

gethorizon.in/builders/technoculture-building-centre-private-limited

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED has 85 projects on the public RERA record across 3 states, filed under 16 approving authorities, first registered 2017 through 2025.

What they build
Residential 79%Plotted 7%Commercial 1%Mixed 13%

Portfolio, summed

Everything the builder declared at registration, added up across the projects on the record.

85
Projects
22
Cities
2017–present
On the record
16
Authorities
34,623
flats declared
232
plots declared
4,03,095 sq m
built-up declared
₹895.16 Cr
declared build cost

Typical filed home size 13027,210 sq ft (median 860) · built-up as filed, from 70 projects that carry unit areas.

Every figure is drawn from the official RERA government registers — as each project declared it, not an independent measurement.

What they build

85projects
  • Residential67 79%
  • Plotted6 7%
  • Commercial1 1%
  • Mixed11 13%

Where they build

  • Bihar82 projects
  • Jharkhand2 projects
  • Uttar Pradesh1 projects

Top cities

  • PATNA5 projects
  • PURNEA3 projects
  • SASARAM3 projects
  • BUXAR3 projects
  • DARBHANGA2 projects
  • AURANGABAD2 projects
  • MUZAFFARPUR2 projects
  • DEHRI-ON-SONE2 projects

Who approves them 16 authorities

  • NAGAR NIGAM SASARAM3 projects
  • EXECUTIVE OFFICER NAGAR PARISHAD BUXAR2 projects
  • CHIEF EXECUTIVE OFFICER MUNICIPAL CORPORATION KATIHAR1 projects
  • MUNICIPAL COMMISSIONER MUNICIPAL CORPORTAION PURNEA1 projects
  • MUKHIYA GRAM PANCHYAT RAJ CHAKANHA DEHRI-ON-SONE1 projects
  • JUNIOR ENGINEER KOILWAR NAGAR PANCHYAT1 projects
  • NAGAR PARISHAD AURANGABAD1 projects
  • CEO MUZAFFARPUR PLANNING AREA AUTHORITY1 projects
  • CEO MOTIHARI PLANNING AREA AUTHORITY1 projects
  • JUNIOR ENGINEER NAGAR PANCHYAT KOILWAR1 projects

The planning authorities that signed these projects off, read from each filing’s approval record — not every state files the approving body, so this covers the projects where it’s on record.

Track record over time

When their projects were registered, and when the filed pipeline is due to complete.

New projects each year

1172182919122010218221323224825

Completion pipeline

326228729230

By each project’s filed (or revised) possession year.

Timelineevery project, start → promised completion
VASTU VIHAR MOBARAKPUR PATNA PROJECT 03VASTU VIHAR BETTIAH PHASE 01 NANOvastu vihar Samastipur phase 01 extension 01VASTU VIHAR AURANGABAD PHASE 01 EXTENSION 01VASTU VIHAR ARAH PHASE 02VASTU VIHAR PATNA PROJECT-08VASTU VIHAR DEHRI PH 01 EXTENSION 01VASTU VIHAR SASARAM PHASE 02 EXTENSION 01VASTU VIHAR HAJIPUR PHASE 02 EXTENSION 01VASTU VIHAR DARBHANGA PH-03 EXT-01VASTU VIHAR GAYA PHASE-03 EXTENSION -2VASTU VIHAR SASARAM PH-03 EXT-01VASTU VIHAR SASARAM PH 04VASTU VIHAR SAMASTIPUR PHASE 02VASTU VIHAR COMMERCIAL COMPLEX CHHAPRA PHASE-02VASTU VIHAR KATIHAR PHASE 01 EXTENSION 01VASTU VIHAR SITAMARHI PHASE 01 EXTENSION 01VASTU VIHAR BHAGALPUR PHASE 02 EXTENSION 01VASTU VIHAR BHAGALPUR PHASE 01 EXTENSION 01VASTU VIHAR MUNGER PHASE 01 EXTENSION 02VASTU VIHAR BEGUSARAI PH 01 EXTENSION 01VASTU VIHAR AURANGABAD PH-03VASTU VIHAR HAJIPUR PHASE-06VASTU VIHAR DEHRI PH 02 EXTENSION 01VASTU VIHAR MUZAFFARPUR PH-02 EXT-01VASTU VIHAR PURNIYA PHASE 02 EXTENSION 1VASTU VIHAR BIHARSHARIF PHASE 03VASTU VIHAR BUXAR PH-02VASTU VIHAR MUZAFFARPUR PH-02 EXT-02VASTU VIHAR KATIHAR PH-01EXT-03VASTU VIHAR SAMASTIPUR PH-01 EXT-02VASTU VIHAR DEHRI-ON-SONE PH-02 EXT-02VASTU VIHAR ARA PH-02 EXT-01VASTU VIHAR SAHARSA PH-02VASTU VIHAR DEHRI-ON-SONE PH-02 EXT-03VASTU VIHAR ARA PH-03VASTU VIHAR MUZAFFARPUR PH-02 EXT-03VASTU VIHAR AURANGABAD PH-02VASTU VIHAR SASARAM PH-05VASTU VIHAR SASARAM PH-05 EXT-01VASTU VIHAR MOTIHARI PH-03VASTU VIHAR SASARAM PH-06VASTU VIHAR ARA PH-03 EXT-01VASTU VIHAR BUXAR PH-02 EXT-01VASTU VIHAR PURNEA PH-03VAstu Vihar Jamshedpur Asangi Ph-06VASTU VIHAR KATIHAR PH-02VASTU VIHAR KATIHAR PH-02 Ext-01VASTU VIHAR SAMASTIPUR PH-02 EXT-01VASTU VIHAR SAMASTIPUR PH-02 EXT-02VASTU VIHAR SASARAM PH-04 EXT-01VASTU VIHAR PURNEA PH-02 EXT-02VASTU VIHAR BOKARO PH-02 ExtensionVASTU VIHAR ARA PH-04VASTU VIHAR BUXAR PH-03VASTU VIHAR DARBHANGA PH-02 EXT-02VASTU VIHAR SAMASTIPUR PH-02 EXT-03V V SAHARSA PH-02 EXT-01V V MOTIHARI PH-03V V DEHRI-ON-SONE PH-03

The projects

85 on the record
Residential/Group Housing

V V DEHRI-ON-SONE PH-03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · SubbaBigha · Dehri-On-Sone

Oct 2025registered
May 2029target completion
Units13 unitsUnit mix6 × 4 BHK · 5 × 5 BHK · 2 × DuplexBuildings4
Residential/Group Housing

V V SAHARSA PH-02 EXT-01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · PATWAHA · SAHARSA

Sep 2025registered
May 2029target completion
Units12 unitsUnit mix12 × 4 BHKBuildings2
Residential/Group Housing

V V MOTIHARI PH-03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KISUNPUR · PIPRAKOTHI MOTIHARI

Sep 2025registered
Oct 2030target completion
Units69 unitsBuildings9Unit mix41 × 2 BHK · 23 × 3 BHK
Residential/Group Housing

VASTU VIHAR BUXAR PH-03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HARIKUSNPUR · BUXAR

Sep 2025registered
Sep 2029target completion
Units17 unitsUnit mix12 × 3 BHK · 3 × 4 BHK · 2 × DuplexBuildings3
Residential/Group Housing

VASTU VIHAR DARBHANGA PH-02 EXT-02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · NANAURA · DARBHANGA

Jul 2025registered
Jul 2029target completion
Units53 unitsBuildings5Unit mix28 × 2 BHK · 9 × 5 BHK
Residential/Group Housing

VASTU VIHAR SAMASTIPUR PH-02 EXT-03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HARPUR AILOUTH · SAMSTIPUR

Jun 2025registered
Feb 2030target completion
Units86 unitsUnit mix64 × 3 BHK · 21 × 2 BHK · 1 × 5 BHKBuildings6
Residential/Group Housing

VASTU VIHAR ARA PH-04

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BAMPLAI · UDWANTNAGAR BHOJPUR

Apr 2025registered
Oct 2029target completion
Units18 unitsUnit mix12 × 2 BHK · 6 × 3 BHKBuildings2
Residential/Group Housing

VASTU VIHAR PURNEA PH-02 EXT-02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Abdullahnagar · Purnea

Jan 2025registered
Jan 2029target completion
Units12 unitsUnit mix12 × 3 BHKParking12 spaces
Residential

VASTU VIHAR BOKARO PH-02 Extension

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Chas

Oct 2024registered
Apr 2029target completion
Units85 unitsCarpet area87–117 sq mParking84 spaces
Residential

VASTU VIHAR SASARAM PH-04 EXT-01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Rohtas

Jun 2024registered
Oct 2025target completion
Land area633 sq mBuilt-up area242 sq m
Residential

VASTU VIHAR SAMASTIPUR PH-02 EXT-02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Samastipur

Aug 2023registered
May 2028target completion
Land area2,422 sq mBuilt-up area5,505 sq m
Residential

VASTU VIHAR SAMASTIPUR PH-02 EXT-01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Samastipur

Jul 2023registered
Mar 2028target completion
Land area10,813 sq mBuilt-up area10,478 sq m
Residential/Group Housing

VASTU VIHAR KATIHAR PH-02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Dalan · Katihar

Jul 2023registered
Mar 2025target completion
Units4 unitsUnit mix4 × 3 BHKParking4 spaces
Residential

VASTU VIHAR KATIHAR PH-02 Ext-01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Katihar

Jul 2023registered
Mar 2026target completion
Land area406 sq mBuilt-up area483 sq m
Residential

VAstu Vihar Jamshedpur Asangi Ph-06

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Gamharia

May 2023registered
Apr 2026target completion
Units30 unitsCarpet area55–84 sq mParking34 spaces
Residential/Group Housing

VASTU VIHAR AURANGABAD PH-02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · RAMPUR TOLA DHANHARA · AURANGABAD

Apr 2023registered
Aug 2025target completion
Units23 unitsUnit mix23 × DuplexBuildings2
Residential/Group Housing

VASTU VIHAR ARA PH-03 EXT-01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · AINWA · BHOJPUR

Apr 2023registered
Sep 2025target completion
Units27 unitsUnit mix16 × Duplex · 9 × 3 BHK · 2 × 4 BHKBuildings4
Plotted Development

VASTU VIHAR PURNEA PH-03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · ABDULLAH NAGAR · PURNEA

Apr 2023registered
Jan 2026target completion
Plots99 plotsLand area15,241 sq mUnit mix36 × Type -1 · 23 × Type -2
Residential/Group Housing

VASTU VIHAR MOTIHARI PH-03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KISUNPUR · MOTIHARI

Mar 2023registered
Nov 2025target completion
Units41 unitsUnit mix24 × 2 BHK · 17 × 3 BHKBuildings3
Residential/Group Housing

VASTU VIHAR BUXAR PH-02 EXT-01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HUKAHA · BUXAR

Mar 2023registered
Sep 2025target completion
Units57 unitsUnit mix53 × 2 BHK · 3 × 3 BHK · 1 × DuplexBuildings4
Residential/Group Housing

VASTU VIHAR SASARAM PH-06

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BAIJLA · SASARAM

Feb 2023registered
Oct 2025target completion
Units9 unitsUnit mix6 × Duplex · 3 × 5 BHKBuildings2
Residential/Group Housing

VASTU VIHAR SASARAM PH-05

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · SEMRA · SASARAM

Jan 2023registered
Oct 2025target completion
Units8 unitsUnit mix8 × DuplexParking8 spaces
Residential/Group Housing

VASTU VIHAR SASARAM PH-05 EXT-01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · SEMRA

Jan 2023registered
Oct 2025target completion
Units14 unitsUnit mix14 × DuplexParking14 spaces
Residential/Group Housing

VASTU VIHAR MUZAFFARPUR PH-02 EXT-03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KULHARIYA · KOILWAR

Oct 2022registered
Jul 2025target completion
Units8 unitsUnit mix8 × DuplexBuildings3
Residential/Group Housing

VASTU VIHAR ARA PH-03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KULHARIYA · KOILWAR

Jul 2022registered
Apr 2025target completion
Units17 unitsBuildings3Unit mix8 × 3 BHK · 6 × 3.5 BHK
Plotted Development

VASTU VIHAR KATIHAR PHASE 01 EXTENSION 01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED

Apr 2022registered
Dec 2025target completion
Plots41 plotsUnit mix26 × Type -2 · 13 × Type -3 · 2 × Type -1Land area6,618 sq m
Residential/Group Housing

VASTU VIHAR DEHRI-ON-SONE PH-02 EXT-03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BADIHAN · DEHRI-ON-SONE

Apr 2022registered
Sep 2024target completion
Units36 unitsUnit mix32 × 2 BHK · 4 × DuplexBuildings3
Residential/Group Housing

VASTU VIHAR ARAH PHASE 02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KAYAM NAGAR

Apr 2022registered
Oct 2024target completion
Units122 unitsUnit mix64 × 1 BHK · 31 × Duplex · 27 × 2 BHKBuildings7
Residential/Group Housing

VASTU VIHAR BETTIAH PHASE 01 NANO

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Bettiah

Units44 unitsUnit mix44 × 1 BHKParking18 spaces
Residential/Group Housing

VASTU VIHAR GAYA PHASE-03 EXTENSION -2

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KAIYA

Units120 unitsUnit mix120 × 1 BHKParking120 spaces
Residential/Group Housing

VASTU VIHAR SAHARSA PH-02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · WARD NO.37 · SAHARSA

Jan 2022registered
Jun 2024target completion
Units48 unitsUnit mix32 × 2 BHK · 16 × 3 BHKBuildings2
Commercial

VASTU VIHAR COMMERCIAL COMPLEX CHHAPRA PHASE-02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Saran Sadar

Apr 2021registered
Nov 2021target completion
Units50 unitsUnit mix50 × ShopLand area554 sq m
Residential/Group Housing

VASTU VIHAR ARA PH-02 EXT-01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KAYAMNAGAR · BHOJPUR

Apr 2021registered
Dec 2025target completion
Parking6 spacesLand area1,316 sq mBuilt-up area1,235 sq m
Residential/Group Housing

VASTU VIHAR HAJIPUR PHASE-06

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · SUBHAI

Apr 2021registered
Jan 2024target completion
Units25 unitsUnit mix25 × 2 BHKLand area3,331 sq m
Residential/Group Housing

vastu vihar Samastipur phase 01 extension 01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Samastipur_sadar

Mar 2021registered
Apr 2021target completion
Units58 unitsUnit mix48 × 2 BHK · 8 × 3 BHK · 2 × 5 BHKBuildings6
Residential/Group Housing

VASTU VIHAR BIHARSHARIF PHASE 03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Silao

Feb 2021registered
Aug 2025target completion
Units84 unitsUnit mix48 × 3 BHK · 36 × 2 BHKBuildings2
Residential/Group Housing

VASTU VIHAR BUXAR PH-02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HUKAHA · BUXAR

Feb 2021registered
Nov 2025target completion
Units18 unitsUnit mix18 × 3 BHKParking18 spaces
Plotted Development

VASTU VIHAR SITAMARHI PHASE 01 EXTENSION 01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED

Feb 2021registered
Nov 2023target completion
Plots28 plotsUnit mix27 × Type -1 · 1 × Type -2Land area3,830 sq m
Residential/Group Housing

VASTU VIHAR DEHRI-ON-SONE PH-02 EXT-02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BADIHAN · DEHRI-ON-SONE

Jan 2021registered
Sep 2025target completion
Units11 unitsUnit mix8 × Duplex · 3 × 2 BHKBuildings3
Plotted Development

VASTU VIHAR MUNGER PHASE 01 EXTENSION 02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · CHANDRAPURA

Jan 2021registered
Nov 2023target completion
Plots8 plotsUnit mix6 × Type -1 · 2 × Type -2Land area1,054 sq m
Residential/Group Housing

VASTU VIHAR SAMASTIPUR PH-01 EXT-02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HARPUR AILOUTH · SAMASTIPUR

Jan 2021registered
Aug 2025target completion
Units64 unitsUnit mix64 × 2 BHKParking64 spaces
Residential/Group Housing

VASTU VIHAR SASARAM PH-03 EXT-01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KUMAHU · SASARAM

Aug 2020registered
Jul 2021target completion
Units61 unitsUnit mix48 × 2 BHK · 8 × 4 BHK · 5 × 3 BHKBuildings3
Residential/Group Housing

VASTU VIHAR KATIHAR PH-01EXT-03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · SIRSA,KANWA

Aug 2020registered
Jan 2025target completion
Units34 unitsUnit mix24 × 2 BHK · 10 × DuplexBuildings2
Plotted Development

VASTU VIHAR BHAGALPUR PHASE 02 EXTENSION 01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED

Jul 2020registered
Nov 2023target completion
Plots15 plotsLand area2,321 sq mUnit mix8 × Type -3 · 3 × Type -1
Residential/Group Housing

VASTU VIHAR MUZAFFARPUR PH-02 EXT-01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BAKARPUR · MUZAFFARPUR

Jul 2020registered
Aug 2025target completion
Units11 unitsUnit mix10 × 3 BHK · 1 × 5 BHKBuildings3
Residential/Group Housing

VASTU VIHAR PURNIYA PHASE 02 EXTENSION 1

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Purnia East · PURNEA

May 2020registered
Aug 2025target completion
Units45 unitsUnit mix45 × DuplexBuildings4
Residential/Group Housing

VASTU VIHAR SASARAM PH 04

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Sasaram

May 2020registered
May 2022target completion
Units16 unitsUnit mix7 × 3 BHK · 7 × 2 BHK · 2 × 5 BHKBuildings3
Residential/Group Housing

VASTU VIHAR MUZAFFARPUR PH-02 EXT-02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BAKARPUR,DARIYAPUR KAFEN · MUZAFFARPUR

May 2020registered
Nov 2024target completion
Units28 unitsUnit mix24 × 2 BHK · 4 × 3 BHKBuildings2
Residential/Group Housing

VASTU VIHAR BEGUSARAI PH 01 EXTENSION 01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Begusarai

Mar 2020registered
Dec 2024target completion
Units24 unitsUnit mix24 × 2 BHKParking12 spaces
Residential/Group Housing

VASTU VIHAR BHAGALPUR PHASE 01 EXTENSION 01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Jagdishpur Sadar

Feb 2020registered
Dec 2025target completion
Units18 unitsUnit mix18 × 2 BHKBuildings2
Residential/Group Housing

VASTU VIHAR DARBHANGA PH-03 EXT-01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · DHOI · DARBHANGA

Feb 2020registered
Apr 2021target completion
Units25 unitsBuildings4Unit mix12 × 1 BHK · 7 × 3 BHK
Plotted Development

VASTU VIHAR SAMASTIPUR PHASE 02

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HARPUR ALLOTH

Feb 2020registered
Nov 2023target completion
Plots41 plotsUnit mix41 × Type -1Land area5,773 sq m
Residential/Group Housing

VASTU VIHAR SASARAM PHASE 02 EXTENSION 01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Sasaram

Feb 2020registered
Apr 2021target completion
Units27 unitsBuildings4Unit mix24 × 1 BHK · 1 × 5 BHK
Residential/Group Housing

VASTU VIHAR AURANGABAD PH-03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · CHATRA · AURANGABAD

Dec 2019registered
Apr 2024target completion
Units46 unitsUnit mix33 × 4 BHK · 13 × 2 BHKBuildings2
Residential/Group Housing

VASTU VIHAR PATNA PROJECT-08

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BELA · PATNA

Dec 2019registered
Oct 2021target completion
Units81 unitsUnit mix64 × 3 BHK · 12 × 5 BHK · 5 × 4 BHKBuildings3
Residential/Group Housing

VASTU VIHAR DEHRI PH 02 EXTENSION 01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Dehri

Nov 2019registered
Jul 2024target completion
Parking15 spacesLand area1,950 sq mBuilt-up area1,078 sq m
Residential/Group Housing

VASTU VIHAR HAJIPUR PHASE 02 EXTENSION 01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Hajipur

Nov 2019registered
Apr 2021target completion
Units13 unitsUnit mix7 × 3 BHK · 5 × 4 BHK · 1 × 5 BHKBuildings4
Mixed Development(residential and commercial)

VASTU VIHAR MOBARAKPUR PATNA PROJECT 03

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · MOBARAKPUR · PATNA

Units249 unitsBuildings7Unit mix150 × 2 BHK · 60 × 2.5 BHK
Mixed Development(residential and commercial)

VASTU VIHAR DEHRI PH 01 EXTENSION 01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Dehri

Oct 2019registered
Apr 2021target completion
Units72 unitsUnit mix62 × 1 BHK · 6 × Shop · 4 × 3 BHKBuildings3
Mixed Development(residential and commercial)

VASTU VIHAR AURANGABAD PHASE 01 EXTENSION 01

TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Deo

Sep 2019registered
Apr 2021target completion
Units15 unitsUnit mix12 × 1 BHK · 3 × ShopParking13 spaces

Showing the 60 most recently registered · 25 more on the record.

⚠ This name appears across 3 states (Bihar, Uttar Pradesh, Jharkhand). RERA identifies a builder by name alone, so these may be separate firms that share a name — read each project’s own record.

Compiled from the official RERA government registers of Bihar, Uttar Pradesh, Jharkhand— every project filed under this name that Horizon has read. Because the record identifies a builder by name, a common name can pool more than one firm; this page groups by name and does not assert that all projects share an owner. Dates are the filing’s registration and target completion, as published by the authority; nothing on this page is a rating, a ranking or a prediction.

Full dossier: gethorizon.in/builders/technoculture-building-centre-private-limited