Residential/Group Housing
V V DEHRI-ON-SONE PH-03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · SubbaBigha · Dehri-On-Sone
3 yr 7 mo
Oct 2025 registered
May 2029 target completion
Units 13 unitsUnit mix 6 × 4 BHK · 5 × 5 BHK · 2 × DuplexBuildings 4
Residential/Group Housing
V V SAHARSA PH-02 EXT-01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · PATWAHA · SAHARSA
3 yr 8 mo
Sep 2025 registered
May 2029 target completion
Units 12 unitsUnit mix 12 × 4 BHKBuildings 2
Residential/Group Housing
V V MOTIHARI PH-03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KISUNPUR · PIPRAKOTHI MOTIHARI
5 yr 1 mo
Sep 2025 registered
Oct 2030 target completion
Units 69 unitsBuildings 9Unit mix 41 × 2 BHK · 23 × 3 BHK +2 more
Residential/Group Housing
VASTU VIHAR BUXAR PH-03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HARIKUSNPUR · BUXAR
4 yr
Sep 2025 registered
Sep 2029 target completion
Units 17 unitsUnit mix 12 × 3 BHK · 3 × 4 BHK · 2 × DuplexBuildings 3
Residential/Group Housing
VASTU VIHAR DARBHANGA PH-02 EXT-02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · NANAURA · DARBHANGA
4 yr
Jul 2025 registered
Jul 2029 target completion
Units 53 unitsBuildings 5Unit mix 28 × 2 BHK · 9 × 5 BHK +3 more
Residential/Group Housing
VASTU VIHAR SAMASTIPUR PH-02 EXT-03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HARPUR AILOUTH · SAMSTIPUR
4 yr 8 mo
Jun 2025 registered
Feb 2030 target completion
Units 86 unitsUnit mix 64 × 3 BHK · 21 × 2 BHK · 1 × 5 BHKBuildings 6
Residential/Group Housing
VASTU VIHAR ARA PH-04 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BAMPLAI · UDWANTNAGAR BHOJPUR
4 yr 6 mo
Apr 2025 registered
Oct 2029 target completion
Units 18 unitsUnit mix 12 × 2 BHK · 6 × 3 BHKBuildings 2
Residential/Group Housing
VASTU VIHAR PURNEA PH-02 EXT-02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Abdullahnagar · Purnea
4 yr
Jan 2025 registered
Jan 2029 target completion
Units 12 unitsUnit mix 12 × 3 BHKParking 12 spaces
Residential
VASTU VIHAR BOKARO PH-02 Extension TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Chas
4 yr 6 mo
Oct 2024 registered
Apr 2029 target completion
Units 85 unitsCarpet area 87–117 sq mParking 84 spaces
Residential
VASTU VIHAR SASARAM PH-04 EXT-01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Rohtas
1 yr 4 mo
Jun 2024 registered
Oct 2025 target completion
Land area 633 sq mBuilt-up area 242 sq m
Residential
VASTU VIHAR SAMASTIPUR PH-02 EXT-02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Samastipur
4 yr 9 mo
Aug 2023 registered
May 2028 target completion
Land area 2,422 sq mBuilt-up area 5,505 sq m
Residential
VASTU VIHAR SAMASTIPUR PH-02 EXT-01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Samastipur
4 yr 8 mo
Jul 2023 registered
Mar 2028 target completion
Land area 10,813 sq mBuilt-up area 10,478 sq m
Residential/Group Housing
VASTU VIHAR KATIHAR PH-02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Dalan · Katihar
1 yr 8 mo
Jul 2023 registered
Mar 2025 target completion
Units 4 unitsUnit mix 4 × 3 BHKParking 4 spaces
Residential
VASTU VIHAR KATIHAR PH-02 Ext-01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Katihar
2 yr 8 mo
Jul 2023 registered
Mar 2026 target completion
Land area 406 sq mBuilt-up area 483 sq m
Residential
VAstu Vihar Jamshedpur Asangi Ph-06 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Gamharia
2 yr 11 mo
May 2023 registered
Apr 2026 target completion
Units 30 unitsCarpet area 55–84 sq mParking 34 spaces
Residential/Group Housing
VASTU VIHAR AURANGABAD PH-02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · RAMPUR TOLA DHANHARA · AURANGABAD
2 yr 4 mo
Apr 2023 registered
Aug 2025 target completion
Units 23 unitsUnit mix 23 × DuplexBuildings 2
Residential/Group Housing
VASTU VIHAR ARA PH-03 EXT-01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · AINWA · BHOJPUR
2 yr 5 mo
Apr 2023 registered
Sep 2025 target completion
Units 27 unitsUnit mix 16 × Duplex · 9 × 3 BHK · 2 × 4 BHKBuildings 4
Plotted Development
VASTU VIHAR PURNEA PH-03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · ABDULLAH NAGAR · PURNEA
2 yr 9 mo
Apr 2023 registered
Jan 2026 target completion
Plots 99 plotsLand area 15,241 sq mUnit mix 36 × Type -1 · 23 × Type -2 +4 more
Residential/Group Housing
VASTU VIHAR MOTIHARI PH-03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KISUNPUR · MOTIHARI
2 yr 8 mo
Mar 2023 registered
Nov 2025 target completion
Units 41 unitsUnit mix 24 × 2 BHK · 17 × 3 BHKBuildings 3
Residential/Group Housing
VASTU VIHAR BUXAR PH-02 EXT-01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HUKAHA · BUXAR
2 yr 6 mo
Mar 2023 registered
Sep 2025 target completion
Units 57 unitsUnit mix 53 × 2 BHK · 3 × 3 BHK · 1 × DuplexBuildings 4
Residential/Group Housing
VASTU VIHAR SASARAM PH-06 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BAIJLA · SASARAM
2 yr 8 mo
Feb 2023 registered
Oct 2025 target completion
Units 9 unitsUnit mix 6 × Duplex · 3 × 5 BHKBuildings 2
Residential/Group Housing
VASTU VIHAR SASARAM PH-05 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · SEMRA · SASARAM
2 yr 9 mo
Jan 2023 registered
Oct 2025 target completion
Units 8 unitsUnit mix 8 × DuplexParking 8 spaces
Residential/Group Housing
VASTU VIHAR SASARAM PH-05 EXT-01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · SEMRA
2 yr 9 mo
Jan 2023 registered
Oct 2025 target completion
Units 14 unitsUnit mix 14 × DuplexParking 14 spaces
Residential/Group Housing
VASTU VIHAR MUZAFFARPUR PH-02 EXT-03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KULHARIYA · KOILWAR
2 yr 9 mo
Oct 2022 registered
Jul 2025 target completion
Units 8 unitsUnit mix 8 × DuplexBuildings 3
Residential/Group Housing
VASTU VIHAR ARA PH-03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KULHARIYA · KOILWAR
2 yr 9 mo
Jul 2022 registered
Apr 2025 target completion
Units 17 unitsBuildings 3Unit mix 8 × 3 BHK · 6 × 3.5 BHK +2 more
Plotted Development
VASTU VIHAR KATIHAR PHASE 01 EXTENSION 01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED
3 yr 8 mo
Apr 2022 registered
Dec 2025 target completion
Plots 41 plotsUnit mix 26 × Type -2 · 13 × Type -3 · 2 × Type -1Land area 6,618 sq m
Residential/Group Housing
VASTU VIHAR DEHRI-ON-SONE PH-02 EXT-03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BADIHAN · DEHRI-ON-SONE
2 yr 5 mo
Apr 2022 registered
Sep 2024 target completion
Units 36 unitsUnit mix 32 × 2 BHK · 4 × DuplexBuildings 3
Residential/Group Housing
VASTU VIHAR ARAH PHASE 02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KAYAM NAGAR
2 yr 6 mo
Apr 2022 registered
Oct 2024 target completion
Units 122 unitsUnit mix 64 × 1 BHK · 31 × Duplex · 27 × 2 BHKBuildings 7
Residential/Group Housing
VASTU VIHAR BETTIAH PHASE 01 NANO TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Bettiah
Units 44 unitsUnit mix 44 × 1 BHKParking 18 spaces
Residential/Group Housing
VASTU VIHAR GAYA PHASE-03 EXTENSION -2 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KAIYA
Units 120 unitsUnit mix 120 × 1 BHKParking 120 spaces
Residential/Group Housing
VASTU VIHAR SAHARSA PH-02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · WARD NO.37 · SAHARSA
2 yr 5 mo
Jan 2022 registered
Jun 2024 target completion
Units 48 unitsUnit mix 32 × 2 BHK · 16 × 3 BHKBuildings 2
Commercial
VASTU VIHAR COMMERCIAL COMPLEX CHHAPRA PHASE-02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Saran Sadar
7 mo
Apr 2021 registered
Nov 2021 target completion
Units 50 unitsUnit mix 50 × ShopLand area 554 sq m
Residential/Group Housing
VASTU VIHAR ARA PH-02 EXT-01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KAYAMNAGAR · BHOJPUR
4 yr 8 mo
Apr 2021 registered
Dec 2025 target completion
Parking 6 spacesLand area 1,316 sq mBuilt-up area 1,235 sq m
Residential/Group Housing
VASTU VIHAR HAJIPUR PHASE-06 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · SUBHAI
2 yr 9 mo
Apr 2021 registered
Jan 2024 target completion
Units 25 unitsUnit mix 25 × 2 BHKLand area 3,331 sq m
Residential/Group Housing
vastu vihar Samastipur phase 01 extension 01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Samastipur_sadar
1 mo
Mar 2021 registered
Apr 2021 target completion
Units 58 unitsUnit mix 48 × 2 BHK · 8 × 3 BHK · 2 × 5 BHKBuildings 6
Residential/Group Housing
VASTU VIHAR BIHARSHARIF PHASE 03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Silao
4 yr 6 mo
Feb 2021 registered
Aug 2025 target completion
Units 84 unitsUnit mix 48 × 3 BHK · 36 × 2 BHKBuildings 2
Residential/Group Housing
VASTU VIHAR BUXAR PH-02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HUKAHA · BUXAR
4 yr 9 mo
Feb 2021 registered
Nov 2025 target completion
Units 18 unitsUnit mix 18 × 3 BHKParking 18 spaces
Plotted Development
VASTU VIHAR SITAMARHI PHASE 01 EXTENSION 01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED
2 yr 9 mo
Feb 2021 registered
Nov 2023 target completion
Plots 28 plotsUnit mix 27 × Type -1 · 1 × Type -2Land area 3,830 sq m
Residential/Group Housing
VASTU VIHAR DEHRI-ON-SONE PH-02 EXT-02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BADIHAN · DEHRI-ON-SONE
4 yr 8 mo
Jan 2021 registered
Sep 2025 target completion
Units 11 unitsUnit mix 8 × Duplex · 3 × 2 BHKBuildings 3
Plotted Development
VASTU VIHAR MUNGER PHASE 01 EXTENSION 02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · CHANDRAPURA
2 yr 10 mo
Jan 2021 registered
Nov 2023 target completion
Plots 8 plotsUnit mix 6 × Type -1 · 2 × Type -2Land area 1,054 sq m
Residential/Group Housing
VASTU VIHAR SAMASTIPUR PH-01 EXT-02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HARPUR AILOUTH · SAMASTIPUR
4 yr 7 mo
Jan 2021 registered
Aug 2025 target completion
Units 64 unitsUnit mix 64 × 2 BHKParking 64 spaces
Residential/Group Housing
VASTU VIHAR SASARAM PH-03 EXT-01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · KUMAHU · SASARAM
11 mo
Aug 2020 registered
Jul 2021 target completion
Units 61 unitsUnit mix 48 × 2 BHK · 8 × 4 BHK · 5 × 3 BHKBuildings 3
Residential/Group Housing
VASTU VIHAR KATIHAR PH-01EXT-03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · SIRSA,KANWA
4 yr 5 mo
Aug 2020 registered
Jan 2025 target completion
Units 34 unitsUnit mix 24 × 2 BHK · 10 × DuplexBuildings 2
Plotted Development
VASTU VIHAR BHAGALPUR PHASE 02 EXTENSION 01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED
3 yr 4 mo
Jul 2020 registered
Nov 2023 target completion
Plots 15 plotsLand area 2,321 sq mUnit mix 8 × Type -3 · 3 × Type -1 +2 more
Residential/Group Housing
VASTU VIHAR MUZAFFARPUR PH-02 EXT-01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BAKARPUR · MUZAFFARPUR
5 yr 1 mo
Jul 2020 registered
Aug 2025 target completion
Units 11 unitsUnit mix 10 × 3 BHK · 1 × 5 BHKBuildings 3
Residential/Group Housing
VASTU VIHAR PURNIYA PHASE 02 EXTENSION 1 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Purnia East · PURNEA
5 yr 3 mo
May 2020 registered
Aug 2025 target completion
Units 45 unitsUnit mix 45 × DuplexBuildings 4
Residential/Group Housing
VASTU VIHAR SASARAM PH 04 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Sasaram
2 yr
May 2020 registered
May 2022 target completion
Units 16 unitsUnit mix 7 × 3 BHK · 7 × 2 BHK · 2 × 5 BHKBuildings 3
Residential/Group Housing
VASTU VIHAR MUZAFFARPUR PH-02 EXT-02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BAKARPUR,DARIYAPUR KAFEN · MUZAFFARPUR
4 yr 6 mo
May 2020 registered
Nov 2024 target completion
Units 28 unitsUnit mix 24 × 2 BHK · 4 × 3 BHKBuildings 2
Residential/Group Housing
VASTU VIHAR BEGUSARAI PH 01 EXTENSION 01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Begusarai
4 yr 9 mo
Mar 2020 registered
Dec 2024 target completion
Units 24 unitsUnit mix 24 × 2 BHKParking 12 spaces
Residential/Group Housing
VASTU VIHAR BHAGALPUR PHASE 01 EXTENSION 01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Jagdishpur Sadar
5 yr 10 mo
Feb 2020 registered
Dec 2025 target completion
Units 18 unitsUnit mix 18 × 2 BHKBuildings 2
Residential/Group Housing
VASTU VIHAR DARBHANGA PH-03 EXT-01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · DHOI · DARBHANGA
1 yr 2 mo
Feb 2020 registered
Apr 2021 target completion
Units 25 unitsBuildings 4Unit mix 12 × 1 BHK · 7 × 3 BHK +2 more
Plotted Development
VASTU VIHAR SAMASTIPUR PHASE 02 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · HARPUR ALLOTH
3 yr 9 mo
Feb 2020 registered
Nov 2023 target completion
Plots 41 plotsUnit mix 41 × Type -1Land area 5,773 sq m
Residential/Group Housing
VASTU VIHAR SASARAM PHASE 02 EXTENSION 01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Sasaram
1 yr 2 mo
Feb 2020 registered
Apr 2021 target completion
Units 27 unitsBuildings 4Unit mix 24 × 1 BHK · 1 × 5 BHK +2 more
Residential/Group Housing
VASTU VIHAR AURANGABAD PH-03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · CHATRA · AURANGABAD
4 yr 4 mo
Dec 2019 registered
Apr 2024 target completion
Units 46 unitsUnit mix 33 × 4 BHK · 13 × 2 BHKBuildings 2
Residential/Group Housing
VASTU VIHAR PATNA PROJECT-08 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · BELA · PATNA
1 yr 10 mo
Dec 2019 registered
Oct 2021 target completion
Units 81 unitsUnit mix 64 × 3 BHK · 12 × 5 BHK · 5 × 4 BHKBuildings 3
Residential/Group Housing
VASTU VIHAR DEHRI PH 02 EXTENSION 01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Dehri
4 yr 8 mo
Nov 2019 registered
Jul 2024 target completion
Parking 15 spacesLand area 1,950 sq mBuilt-up area 1,078 sq m
Residential/Group Housing
VASTU VIHAR HAJIPUR PHASE 02 EXTENSION 01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Hajipur
1 yr 5 mo
Nov 2019 registered
Apr 2021 target completion
Units 13 unitsUnit mix 7 × 3 BHK · 5 × 4 BHK · 1 × 5 BHKBuildings 4
Mixed Development(residential and commercial)
VASTU VIHAR MOBARAKPUR PATNA PROJECT 03 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · MOBARAKPUR · PATNA
Units 249 unitsBuildings 7Unit mix 150 × 2 BHK · 60 × 2.5 BHK +2 more
Mixed Development(residential and commercial)
VASTU VIHAR DEHRI PH 01 EXTENSION 01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Dehri
1 yr 6 mo
Oct 2019 registered
Apr 2021 target completion
Units 72 unitsUnit mix 62 × 1 BHK · 6 × Shop · 4 × 3 BHKBuildings 3
Mixed Development(residential and commercial)
VASTU VIHAR AURANGABAD PHASE 01 EXTENSION 01 TECHNOCULTURE BUILDING CENTRE PRIVATE LIMITED · Deo
1 yr 7 mo
Sep 2019 registered
Apr 2021 target completion
Units 15 unitsUnit mix 12 × 1 BHK · 3 × ShopParking 13 spaces
Showing the 60 most recently registered · 25 more on the record.