HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
25 units
Mix
20 × 3BHK · 5 × 2BHK
Booked
25 of 25 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,257 sq m
Floor area
5,482 sq m
Description
223ChurchStreet by Providence

Timeline

Project startedJul 2017
RERA registeredApr 2021
Proposed completionOct 2022
TodayJul 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

0 of 25 available
TypeArea sq mAvailable
3BHK1040 of 10
3BHK1030 of 5
3BHK880 of 5
2BHK710 of 5

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Providence Lifespace Pvt Ltd

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
3Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
69 homeson the public record across 3 projects
9,535 sq mbuilt-up filed
2,879 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
East Church Road
Village
ANGAMALY
Taluk
Aluva
District
Ernakulam
Pincode
683572
Survey no.
Re Sy. No.12/7,Re Sy. No.12/7-2, Re Sy. No.12/7-3, Re Sy. No.12/7-4
Patta no.
4400, 5745, 10831, 10979
What’s nearby
Schools1 school within 1km · 4 educational institutions within 1km · College or university 154m away
HealthcareHospital 115m away
LifestylePark 1.4km away · Gym or sports centre 1.2km away · 8 restaurants and cafes within 1km
ShoppingSupermarket 434m away · Mall 777m away · Convenience store within 1km
Getting around
Expressway 179 m · Salem - Kochi - Kanyakumari HighwayPrimary road 149 m · MC RoadRailway line 1.3 kmRailway station 1.3km away (Angamali (Kaladi))8 bus stops within 500m
Water & environment
Water body 488 mCanal 566 m · Idamalayar Irrigation CanalRiver 1.3 km · Angamaly-Manjaly Thod
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Angamaly Municipality

Municipality
approved 3 Oct 2016 · 9 yrs ago
Building Permit no. BA-41/15-16Survey no. Re Sy. No.12/7,Re Sy. No.12/7-2, Re Sy. No.12/7-3, Re Sy. No.12/7-4

The promised possession date (15 Oct 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BA-41/15-16 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Municipal Corporation / Municipality

A city corporation or municipality that sanctions building & development permits within its own limits. It has approved 871 RERA projects across 12 districts about 1 in 2 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.