This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
364 EWS T/S UNDER PMAY AT JALNA DIS JALNA
Floors
2
Buildings
25
Land area
27,922 sq m
Sanctioned built-up
20,585 sq m
Recreational open space
5,962 sq m
Timeline
RERA registeredSep 2017
Proposed completionJul 2019
TodaySep 2026
Complete project overview — done
02
Builder’s track record
MahaRERA · Builder registration
AURANGABAD HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA)
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Ambajogai Municipal CouncilMunicipal Council1 of 5 projects
Chhatrapati Sabhajinagar Housing Area And Development Board1 of 5 projects
Maharashtra Housing Area & Development AuthorityDevelopment Authority1 of 5 projects
Maharashtra Housing Area And Devlopment Authority1 of 5 projects
Municipal Council, JalnaMunicipal Councilthis project1 of 5 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNo schools within 2km · College or university 745m away
HealthcareHospital 1.2km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 776 m · Aurangabad Jalna RoadPrimary road 1.3 km · Kacher Rd.Railway line 768 mRailway station 2.9km away (Jalna)Limited bus connectivity nearby
Water & environment
Water body 1.5 km
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground within ~80 m of the recorded location until 2018; a building is first visible in 2019 and is about 6 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~80 m of the filed location.
Satellite photographs of the same ground
Mar 2017Mar 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2019.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~80 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate checked only against its district, not its pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
MahaRERA · Approved building plan
Municipal Council, Jalna
Municipal Council
Building Permit
Survey no. 488/15
The promised possession date (2 Jul 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation
A city municipal corporation that approves projects within its own limits. It has approved 12,653 RERA projects across 34 districts — about 1 in 2 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
07
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
16 residential projects still under way within 25 km. Step out ring by ring:
Of the 41 projects the radar draws within 6 km — every kind, every stage — 11 are residential projects still under way. This list keeps only those, and looks further out.
5 projects between 1 and 3 km — showing the nearest 5.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Maharashtra's published schedules.
06Planning authority
MahaRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
MahaRERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/364-ews-t-s-under-pmay-at-jalna-dis-jalna-m-cl-4ufh600e.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.