4 × 3BHK+Servent- Third Floor · 4 × 3BHK+Servent- Fourth Floor & Fifth Floor · 4 × 3BHK+Servent- Second Floor · 4 × 3BHK+Servent- First Floor
Carpet area
125–143 sq mper-type range, as filed
Land area
1,701 sq m
Description
Project name has been changed from “Akshat Kanota Sky Villa 2” to "Akshat Kanota Sky Homes 2" and all the declarations, undertakings, agreements and other documents executed by the promoter with “Akshat Kanota Sky Villa 2” as the name of this project will continue to hold good for this project now named as "Akshat Kanota Sky Homes 2".
Timeline
Construction startMay 2022
RERA registeredAug 2022
Proposed completionMay 2024
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
16 units across 4 batches
BuildingTypeArea sq mCount
Akshat Kanota Sky Villa 23BHK+Servent- Third Floor1254
Akshat Kanota Sky Villa 23BHK+Servent- Fourth Floor & Fifth Floor1434
Akshat Kanota Sky Villa 23BHK+Servent- Second Floor1254
Akshat Kanota Sky Villa 23BHK+Servent- First Floor1254
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 910m away · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 943 m · Agra Jaipur Bikaner RoadRailway line 4.2 kmRailway station 4.2km away (Kanauta)Bus stop within 1km
Water & environment
River 1.7 km · DhundWater body 2.7 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹8.50 Cr declared to build 16 flats. What that works out to:
₹53.13 Lakhdeclared cost per flatall-in — land + construction
₹2,213/sq ftof built-up area₹23,820/sq m
28%of the cost is land₹1,277/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates (rural branch)
In Rajasthan it’s called the DLC rate.
₹4,599per sq yd
₹5,500per sq m
Which rate
residential land
Matched to
The rate published for the village of “Kanota”.
Spread
₹3,930 – ₹9,030 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 1 Aug 2022 · 4 yrs ago
The promised possession date (4 May 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
342 residential projects still under way within 25 km. Step out ring by ring:
Of the 15 projects the radar draws within 6 km — every kind, every stage — 3 are residential projects still under way. This list keeps only those, and looks further out.