Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
34 plots across 1 batch
TypeArea sq mCount
Plots034
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 541 mPrimary road 3.1 km · Ponda Western BypassNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 666 mWater body 1.9 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Goa Revenue Department — land rates notified in the Official Gazette
In Goa it’s called the notified land rate.
₹1,003per sq yd
₹1,200per sq m
Which rate
land — developing area, base value (settlement zone S1, plot up to 1,000 m²)
Matched to
The rate published for the village of “Curti”.
In force
2020-21 schedule
What this number is — and isn’t
The minimum value Goa’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Goa · Approved building plan
Layout Permit
The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RERA Goa · public record
Complaints register
Not published. RERA Goa doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Goa
Litigation
None declared in this filing
Only what the builder declared, or what RERA Goa records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Goa, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2 plotted projects still under way within 25 km. Step out ring by ring:
1 project between 10 and 20 km — showing the nearest 1.