Complete project overview

K-RERA · Registration filing
Units
95 units
Mix
95 × 1BHK
Booked
6 of 95 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
4,160 sq m
Floor area
7,341 sq m
Description
ANANTA LIVING - DHARANI

Timeline

Project startedDec 2023
RERA registeredFeb 2024
Proposed completionApr 2028
TodayJul 2026
Construction progress

0% overall, as filed

Basement(s) and Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation5%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

89 of 95 available
TypeArea sq mAvailable
1BHK427 of 7
1BHK4311 of 12
1BHK4470 of 75
1BHK431 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

BUILTECH HOUSING LLP

Limited Liability PartnershipPromoter type
Palakkad, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2024–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
PULLODE
Village
MANKARA
Taluk
Palakkad
District
Palakkad
Pincode
678613
Survey no.
SURVEY NO. 20/4,19/1B,19/1B RE SURVEY 180/29,30,31
Patta no.
8401
What’s nearby
SchoolsNearest school 1.7km away · Library 1.7km away
HealthcareHospital 1.1km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.4 km · Salem - Kochi - Kanyakumari HighwayPrimary road 1.5 km · Pazhayannur-Alathur RoadNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 210 m · ChambrakulamCanal 599 mRiver 782 m · Gayathri River
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Mankara Grama Panchayat Palakkad

Local body (LSGI)
approved 16 Sep 2023 · 2 yrs ago
Building Permit no. A5-BA(304601)/2023Survey no. SURVEY NO. 20/4,19/1B,19/1B RE SURVEY 180/29,30,31
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan A5-BA(304601)/2023 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.