HORIZON
Share

APEX HOME

P52000022696 · MahaRERA · https://gethorizon.in/projects/apex-home-navi-mumbai-panvel-ft2kl1rd

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
34 units
Mix
20 × 1 RK · 8 × 2 BHK · 6 × Shop
Carpet area
16–37 sq mper-unit range, as filed
Floors
5
Parking
9 spaces
Land area
560 sq m

Timeline

RERA registeredOct 2019
Proposed completionDec 2023
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

34 units across 8 batches
TypeArea sq mCount
1 RK254
1 RK264
1 RK178
1 RK174
Shop164
2 BHK374
2 BHK374
Shop182

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

LALJI NATHALAL DEVDA

IndividualPromoter type
Raigarh, MAHARASHTRABased in
1Projects
1City
2019–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Navi Mumbai Panvel Rigardh (CT)
Taluka
Panvel
District
Raigarh
Pincode
410206
Survey no.
PLOT NO 109
North boundary
PLOT NO 133 134
East boundary
PLOT NO 110
South boundary
15 Mtrs Wide Road
West boundary
PLOT NO 108
What’s nearby
SchoolsNearest school 1.3km away
HealthcareHospital 1.4km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 92 mPrimary road 512 mRailway line 1.1 km · JNPTRailway station 2.0km away (Khandeshwar)Limited bus connectivity nearby
Water & environment
River 425 m · Kalundre RiverWater body 645 mCanal 652 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

City and Industrial Development Corporation (CIDCO)

Development Authority
Building Permit
Survey no. PLOT NO 109

The promised possession date (30 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

City and Industrial Development Corporation (CIDCO)

Metropolitan / development authority

Has approved 885 RERA projectsabout 1 in 23 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
724
On record
7,061 flats · 987 plots
Reach
5 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

2,603 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,956 projects the radar draws within 6 km — every kind, every stage — 493 are residential projects still under way. This list keeps only those, and looks further out.

34 projects within 1 km — showing the nearest 6.

10 m awayOthers

Sai Mangalmurti

Avinash Damodar Naik · Vadghar · Panvel

Apr 2024registered
Dec 2026target completion
Government Guidance Rate₹46,238/sq ydScale34 flatsAuthorityMahaRERA
140 m awayOthers

RASIKA RESIDENCY

SIDDHIVINAYAK BUILDCON · Karanjade · Panvel

Jan 2024registered
Mar 2027target completion
Scale35 flatsAuthorityMahaRERA
180 m awayOthers

SIDDHIVINAYAK EKDANT

KIRAN NARAYAN PAWAR · Vadghar · Panvel

Dec 2023registered
Mar 2027target completion
Government Guidance Rate₹46,238/sq ydScale60 flatsAuthorityMahaRERA
220 m awayResidential / Group Housing

Surya Nath Niwas

Akhand Realtors · Pushapak · Panvel

Aug 2026registered
Dec 2027target completion
Scale39 flatsAuthorityMahaRERA
290 m awayOthers

SHREE SAMARTH RESIDENCY

MILESTONE CONSTRUCTION · Vadghar · Panvel

Nov 2022registered
Oct 2026target completion
Government Guidance Rate₹46,238/sq ydScale31 flatsAuthorityMahaRERA
330 m awayOthers

Infragate Taj

Sharda Infra · Vadghar · Panvel

Mar 2024registered
Dec 2026target completion
Government Guidance Rate₹46,238/sq ydScale41 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.