101Ground Floor · STAR BLOCK2BHK57.517.391.9826.9593.829.29
102Ground Floor · STAR BLOCK2BHK66.973.122.9528.69101.739.29
201First Floor · STAR BLOCK2BHK57.517.391.9826.9593.829.29
202First Floor · STAR BLOCK2BHK66.973.122.9528.69101.739.29
301Second Floor · STAR BLOCK2BHK57.517.391.9826.9593.829.29
302Second Floor · STAR BLOCK2BHK66.973.122.9528.69101.739.29
401Third Floor · STAR BLOCK2BHK57.517.391.9826.9593.829.29
402Third Floor · STAR BLOCK2BHK66.973.122.9528.69101.739.29
501Fourth Floor · STAR BLOCK2BHK57.517.391.9826.9593.829.29
502Fourth Floor · STAR BLOCK2BHK66.973.122.9528.69101.739.29
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.
All 10 units as filed, two to a row · areas in sq m
60 homes · 210 plotson the public record across 5 projects
7,057 sq mbuilt-up filed
35,496 sq mplotted area
61,727 sq mland declared
₹30.30 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Director, Town and Country PlanningTown & Country Planning (DTCP)this project4 of 5 projects
Commissioner, ULBMunicipal / Corporation1 of 5 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.6km away · College or university 1.6km away
HealthcareHospital 243m away
LifestylePark 1.0km away
ShoppingSupermarket 1.6km away · Mall 1.9km away
Getting around
Expressway 4.0 kmPrimary road 1.4 km · Etcherla - Thotapalem RoadNo metro or railway within 5kmBus stop within 500m
Water & environment
River 448 mWater body 832 m
distances only — not a flood assessment
Declared external development
Roads0%
Water supply0%
Sewage0%
Electricity0%
Solid waste0%
Fire safety0%
Water0%
Emergency exits0%
Renewable energy0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisdeclared build cost — not a sale price
₹1.75 Cr declared to build 10 flats. What that works out to:
₹17.46 Lakhdeclared cost per flatall-in — land + construction
₹1,515/sq ftof built-up area₹16,311/sq m
0%of the cost is land₹0/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
No building detected within ~20 m of the recorded location in any year from 2016 to 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.
Satellite photographs of the same ground
Feb 2017Mar 2023Feb 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Andhra Pradesh registration department
In Andhra Pradesh it’s called the market value — the registration department's figure, not a sale price.
No government guidance rate is shown for this project.
Andhra Pradesh's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
RERA Andhra Pradesh · Approved building plan
Director, Town and Country Planning
Town & Country Planning (DTCP) · SRIKAKULAM
approved 7 May 2021 · 5 yrs ago
Building Permit no. 1085/0040/B/SRI/CAD/2021Survey no. 730/1P,2P,3P, 731/2P, 729/1P,2P
The promised possession date (7 May 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 1085/0040/B/SRI/CAD/2021 on the approving authority’s portal (dtcp.ap.gov.in) to confirm the approval.
The approving body, at scale
Srikakulam
Municipal Corporation
Has approved 92 RERA projects — 1.4% of Andhra Pradesh.
an apartments market — 73% apartments · 27% plotted layouts. Apartments like yours are this body's core business.
Builders
71
On record
1,190 flats · 5,124 plots
Reach
13 mandals
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Andhra Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Andhra Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Andhra Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Andhra Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
48 residential projects still under way within 25 km. Step out ring by ring:
Of the 61 projects the radar draws within 6 km — every kind, every stage — 39 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Andhra Pradesh's published schedules.
06Planning authority
RERA Andhra Pradesh: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
RERA Andhra Pradesh's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/arsun-galaxy-star-block-srikakulam-93dc89q3.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.