Complete project overview

K-RERA · Registration filing
Units
63 units
Mix
48 × 3BHK · 15 × 2BHK
Buildings
1
Land area
5,225 sq m
Floor area
13,023 sq m
Description
ASTEN DEW DALE APARTMENTS

Timeline

Project startedNov 2014
RERA registeredApr 2021
Proposed completionDec 2027
TodayJul 2026
Construction progress

28% overall, as filed

Sanitary Fittings0%
Electrical Fittings0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings15%
Staircases, Lifts Wells40%
Overhead and Underground Water Tanks.40%
Stilt Floor50%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

63 of 63 available
TypeArea sq mAvailable
3BHK12815 of 15
2BHK9215 of 15
3BHK1281 of 1
3BHK11632 of 32

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

ASTEN PROPERTIES AND DEVELOPER PRIVATE LIMITED

CompanyPromoter type
Kottayam, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
KOLLAM-THENI HIGHWAY
Village
KANJIRAPPALLY
Taluk
KANJIRAPPALLY
District
Kottayam
Pincode
686507
Survey no.
398/1,45/1-2, 45/1-1, 44/4
Patta no.
4719, 4720
What’s nearby
Schools1 school within 500m · 6 educational institutions within 1km · College or university 588m away
HealthcareHospital 314m away · Clinic within 2km · Pharmacy within 500m
LifestylePark 1.9km away · Gym or sports centre 1.4km away · 13+ restaurants and cafes within 1km
ShoppingSupermarket 345m away · Convenience store within 500m · Bank 131m away
Getting around
Expressway 20 m · NH183Primary road 266 m · Sabarimala - Kodaikkanal RoadNo metro or railway within 5km8 bus stops within 500m
Water & environment
River 235 m · ChittarWater body 460 m · nainar masjid pond
distances only — not a flood assessment
Land, title & encumbrance
LitigationA litigation is declared on record — verify directly with K-RERA
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Kanjirapally Panchayath

Local body (LSGI)
approved 22 May 2015 · 11 yrs ago
Building Permit no. A7-6946/2011Survey no. 398/1,45/1-2, 45/1-1, 44/4
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan A7-6946/2011 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.