HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

ATHARV RESIDENCY

P52400079301 · MahaRERA · https://gethorizon.in/projects/atharv-residency-latur-m-cl-2fprcr18

01

Complete project overview

MahaRERA · Registration filing
Units
56 units
Mix
56 × 2 BHK
Carpet area
67–81 sq mper-unit range, as filed
Floors
8
Buildings
2
Parking
26 spaces
Land area
1,793 sq m
Sanctioned built-up
5,126 sq m

Timeline

RERA registeredFeb 2025
Proposed completionDec 2026
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

56 units across 4 batches
TypeArea sq mCount
2 BHK7324
2 BHK8124
2 BHK674
2 BHK804

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Atharv Buildcon

PartnershipPromoter type
Beed, MAHARASHTRABased in
1Projects
1City
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
≈ area only · geocoded, verified but not exact · 18.4050, 76.5893 · © OpenStreetMap contributors
Village
Latur (M Cl)
Taluka
Latur
District
Latur
Pincode
413512
Survey no.
Plot No. 19 to 26, S. No. 172
North boundary
By 9 Mtr Wide Road
East boundary
By 12 Mtr Wide DP Road and Open Space
South boundary
By 9 Mtr Wide Road and Open Space
West boundary
By 9 Mtr Wide Road
What’s nearby
Schools1 school within 1km · College or university 1.2km away · Library 1.7km away
HealthcareHospital 487m away · 4 clinics within 1km
LifestylePark 757m away · Gym or sports centre 1.5km away · Swimming pool within 2km
ShoppingSupermarket 1.5km away · Mall 722m away
Getting around
Expressway 1.3 km · Shindeshwar RoadPrimary road 513 mRailway line 2.4 kmRailway station 4.5km away (Latur Railway Station)Bus stop within 1km
Water & environment
Water body 1.3 kmCanal 3.3 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹25,820per sq yd
₹30,880per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Latur (M Cl)”.
In force
2026-2027 schedule
Spread
₹18,763₹52,425 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Latur Municipal Corporation

Municipal Corporation
Building Permit
Survey no. Plot No. 19 to 26, S. No. 172
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Latur Municipal Corporation

Municipal corporation

Has approved 32 RERA projects0.2% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
29
On record
204 flats · 0 plots
Since
2019

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

45 residential projects still under way within 25 km. Step out ring by ring:

5 projects within 1 km — showing the nearest 5.

WasangaonResidential / Group Housing

Indraprasth

DIVYA CONSTRUCTION

May 2022registered
Apr 2027target completion
Scale668 flatsAuthorityMahaRERA
LaturResidential / Group Housing

MS ROYAL CITY

MS PROPERTY DEVELOPERS PRIVATE LIMITED

Mar 2025registered
Dec 2028target completion
Government Guidance Rate₹25,820/sq ydScale224 flatsAuthorityMahaRERA
LaturResidential / Group Housing

SHREEJA RESIDENCY

VASTU SHREEJA BUILDCON LLP

Sep 2023registered
Jun 2028target completion
Government Guidance Rate₹25,820/sq ydAuthorityMahaRERA
LaturResidential / Group Housing

PASAYDAN Heights

PASAYDAN Heights LLP

Jan 2024registered
Dec 2026target completion
Government Guidance Rate₹25,820/sq ydScale23 flatsAuthorityMahaRERA
LaturOthers

KAUSHALYA PRIME

KAUSHALYA ASSOCIATES

Mar 2025registered
Feb 2027target completion
Government Guidance Rate₹25,820/sq ydScale37 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/atharv-residency-latur-m-cl-2fprcr18.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.