ATULYA HOMES

TN/16/Building/0116/2025 · TNRERA · https://gethorizon.in/projects/atulya-homes-jtgzcvf8

01

Complete project overview

TNRERA · Registration filing
Description
Registration for Block A with Stilt Floor + 4 Floors with 48 Dwelling Units, Block B with Stilt Floor + 4 Floors with 56 Dwelling Units & Block C with Stilt Floor + 4 Floors with 48 Dwelling Units Totally 152 Dwelling Units Residential Building at Kottapattu, Ward AV, Block 11, Rajanagar Extension II, Ponmalai Zone, Tiruchirappalli District.
Registration no.
TN/16/Building/0116/2025

Timeline

RERA registeredApr 2025
Proposed completionDec 2025
TodaySep 2026
02

Builder’s track record

TNRERA · Builder registration

SRI RANGAN BUILDER PRIVATE LIMITED Its MD V. KAILASAM

SRI RANGAN BUILDER PRIVATE LIMITED Its MD V. KAILASAMPromoter
1Projects
1Cities
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

TNRERA · Registration filing
What’s nearby
SchoolsNearest school 1.6km away · College or university 548m away
HealthcareNearest hospital 2.0km away
LifestyleNo parks within 2km
ShoppingSupermarket 1.1km away
Getting around
Expressway 1.6 km · Pudukottai RoadPrimary road 4.8 km · Trichy - Madurai - Tuticorin Road (Old NH45B)Railway line 444 mNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Canal 493 mWater body 852 mRiver 4.1 km · Koraiaru
distances only — not a flood assessment
04

Government Guidance Rate

Tamil Nadu registration department

In Tamil Nadu it’s called the guideline value.

No government guidance rate is shown for this project.

Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

TNRERA · Approved building plan

Town & Country Planning (DTCP)

Town & Country Planning (DTCP)
approved 7 Apr 2025 · 1 yr ago
Planning Permission no. 90/2017

The promised possession date (27 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan 90/2017 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Town & Country Planning (DTCP)

Town & country planning

Has approved 756 RERA projectsabout 1 in 5 in Tamil Nadu.

Builders
467
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by TNRERA

07

Other projects nearby

The register · within 25 km

27 residential and mixed-use projects still under way within 25 km. Step out ring by ring:

Of the 12 projects the radar draws within 6 km — every kind, every stage — 11 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.

4 projects between 1 and 3 km — showing the nearest 4.

1.9 km away

NAVARATHNA PARK RESIDENCY

Door No.M/s. Navarathna Property Developers

Feb 2026registered
Dec 2030target completion
AuthorityTNRERA
1.9 km away

OXINA ELYSIAN

OXINA LAND DEVELOPERS PRIVATE LIMITED

Nov 2025registered
Mar 2028target completion
AuthorityTNRERA
2.9 km away

Jeyam's Palace

Jeyam Builders

May 2024registered
May 2029target completion
AuthorityTNRERA
2.9 km away

Jeyam's Empire

Jeyam Builders

Apr 2024registered
Dec 2028target completion
AuthorityTNRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — TNRERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — TNRERA does not publish a complaints register. This read cannot speak to them either way.
  • Escrow — TNRERA does not publish escrow declarations. Whether buyer money is ring-fenced cannot be read here.