Awestrum Life

P51800052584 · MahaRERA · https://gethorizon.in/projects/awestrum-life-andheri-uokjif4a

01

Complete project overview

MahaRERA · Registration filing
Floors
3
Buildings
2
Land area
968 sq m
Recreational open space
447 sq m

Timeline

RERA registeredSep 2023
Proposed completionJul 2027
TodaySep 2026
Construction progress
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Solid Waste Manage…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Aggregate area of …0%
Basement (if any)95%
Excavation100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

TRU SUN-VISION REALTY LLP

CompanyPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2023–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400053
Survey no.
195 part
North boundary
Building No 42
East boundary
9 mtr DP Road
South boundary
Building No 38
West boundary
Building No 41
What’s nearby
Schools1 school within 500m · Library 1.9km away
HealthcareHospital 514m away · 5 clinics within 1km · Pharmacy within 1km
LifestylePark 1.3km away · Gym or sports centre 456m away · 26+ restaurants and cafes within 1km
ShoppingSupermarket 610m away · Mall 721m away · Convenience store within 1km
Getting around
Expressway 2.7 kmPrimary road 18 m · Link RoadRailway line 1.8 km · Central Railway (Harbour Line)Metro station 703m away (Andheri (West))4 bus stops within 500m
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Maharashtra Housing And Area Developmient Authority

Building Permit
Survey no. 195 part
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that approved this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

3,583 residential projects still under way within 25 km. Step out ring by ring:

35 projects within 1 km — showing the nearest 6.

AndheriResidential / Group Housing

UMANG HEIGHTS

L K INFRACON LLP

Nov 2021registered
Aug 2026target completion
Scale106 flatsAuthorityMahaRERA
AndheriResidential / Group Housing

Park Altezza

SHREE MAHAVIR ESTATE AMEYA

Jun 2022registered
Dec 2029target completion
Scale138 flatsAuthorityMahaRERA
AndheriResidential / Group Housing

PARK GRANDEZZA

SHREE MAHAVIR ESTATES

Jun 2024registered
Feb 2034target completion
Scale140 flatsAuthorityMahaRERA
AndheriResidential / Group Housing

Juhu Serene

SAPTRISHI INFRACON PRIVATE LIMITED

Aug 2024registered
Sep 2029target completion
AuthorityMahaRERA
AndheriResidential / Group Housing

ATHENA

ASTRUM DEVELOPERS

Jul 2025registered
Aug 2027target completion
Scale67 flatsAuthorityMahaRERA
AndheriResidential / Group Housing

Nest Wing B

M86 Residency Private Limited

Feb 2026registered
Mar 2030target completion
Scale52 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.