HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
35 units
Mix
15 × 2BHK · 8 × 3BHK · 8 × 4BHK · 4 × Shops and Showrooms
Buildings
1
Land area
1,100 sq m
Floor area
6,629 sq m
Description
Beyond Infinity

Timeline

Project startedMar 2025
RERA registeredJul 2025
Proposed completionDec 2030
TodayJul 2026
Construction progress

3% overall, as filed

Basement(s) and Plinth0%
Slabs of Super Structure0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation50%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

35 of 35 available
TypeArea sq mAvailable
Shops and Showrooms1581 of 1
3BHK848 of 8
4BHK1188 of 8
2BHK7215 of 15
Shops and Showrooms761 of 1
Shops and Showrooms2081 of 1
Shops and Showrooms1541 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

CASADEL PROPERTIES PRIVATE LIMITED

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
2Projects
1Cities
2023–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
109 homeson the public record across 2 projects
16,995 sq mbuilt-up filed
3,314 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
KalamasseryLocal body (LSGI)this project1 of 2 projects
Vadavucode-Puthencruz GramapanchayathLocal body (LSGI)1 of 2 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
National Highway 47
Village
THRIKKAKARA NORTH
Taluk
Kanayannur
District
Ernakulam
Pincode
682033
Survey no.
494/4,494/3
Patta no.
31994
What’s nearby
Schools1 school within 1km · College or university 1.2km away · Library 877m away
HealthcareHospital 653m away · 4 clinics within 1km · Pharmacy within 1km
LifestyleNo parks within 2km · Playground within 500m · Gym or sports centre 690m away
ShoppingSupermarket 118m away · Mall 1.3km away · Bank 175m away
Getting around
Expressway 68 m · Salem - Kochi - Kanyakumari HighwayPrimary road 177 mRailway line 405 mMetro station 394m away (Cochin University)3 bus stops within 500m
Water & environment
Water body 960 m · CUSAT Reservoir
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Kalamassery

Local body (LSGI)
approved 18 Dec 2024 · 1 yr ago
Building Permit no. BA-68/2023Survey no. 494/4,494/3
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BA-68/2023 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.