HORIZON
Share

BLISS APARTMENTS

T1/OL/195/2025 · K-RERA · https://gethorizon.in/projects/bliss-apartments-manathala-thrissur-ikt4c2b9

01

Complete project overview

K-RERA · Registration filing
Units
11 units
Mix
9 × 2BHK · 1 × Old Existing House · 1 × Existing Old House
Buildings
1
Land area
973 sq m
Floor area
915 sq m
Description
BLISS APARTMENTS

Timeline

Project startedFeb 2019
Proposed completionFeb 2022
RERA registeredMar 2026
TodaySep 2026
Construction progress

83% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Excavation100%
Basement(s) and Plinth100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Excavation100%
Basement(s) and Plinth100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

11 of 11 available
TypeArea sq mAvailable
2BHK573 of 3
2BHK433 of 3
2BHK553 of 3
Old Existing House1441 of 1
Existing Old House981 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

KAMARU

Thrissur, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Manathala
Village
MANATHALA
Taluk
Chavakkad
District
Thrissur
Pincode
680506
Survey no.
258/2A
Patta no.
11200
What’s nearby
Schools1 school within 500m · 5 educational institutions within 1km · College or university 893m away
HealthcareHospital 435m away · Clinic within 2km
Lifestyle1 park within 500m · Gym or sports centre 916m away · 4 restaurants and cafes within 1km
ShoppingSupermarket 369m away · Mall 388m away · Convenience store within 500m
Getting around
Expressway 71 m · Ponnani-Chavakkad-Kodungallur HighwayPrimary road 489 m · Chavakkad - Wadakkanchery RoadRailway line 3.5 kmRailway station 3.5km away (Guruvayur)2 bus stops within 500m
Water & environment
Water body 87 m · Manathala Palli KulamCanal 334 m · Conolly Canal
distances only — not a flood assessment
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹2,207per sq yd
₹2,640per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The value published for this project's own survey number, in “Manathala”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Chavakkad Muncipality

Local body (LSGI)
approved 2 Feb 2019 · 7 yrs ago
Building Permit no. E2-BA (24208)/2019Survey no. 258/2A

The promised possession date (21 Feb 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan E2-BA (24208)/2019 on the approving authority’s portal to confirm the approval.

The approving body, at scale

The local self-government (LSGI)

The local body that approved this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

61 residential projects still under way within 25 km. Step out ring by ring:

6 projects between 1 and 3 km — showing the nearest 6.

GURUVAYURResidential (Apartment)

Kovilakam Sobhanam

Sasidharan M

Feb 2026registered
Nov 2028target completion
Government Guidance Rate₹2,207/sq ydScale20 flatsAuthorityK-RERA
GURUVAYURResidential (Apartment)

SHIVADAM

Rockshield Realtors and Developers Pvt Ltd

Oct 2023registered
Jun 2026target completion
Government Guidance Rate₹3,311/sq ydScale8 flatsAuthorityK-RERA
GURUVAYURResidential (Apartment)

Ambadi Apartments

SREEPATHI ASSOCIATES BUILDERS & PROMOTERS

Dec 2024registered
Nov 2026target completion
Government Guidance Rate₹3,311/sq ydScale12 flatsAuthorityK-RERA
GURUVAYURResidential (Apartment)

TBPL HARIKEERTHANAM

Thrissur Builders Private Limited

Oct 2025registered
Dec 2030target completion
Government Guidance Rate₹1,104/sq ydScale50 flatsAuthorityK-RERA
GURUVAYURResidential (Apartment)

AAZIM HOMES

Abdul Rasheed

Sep 2025registered
Jul 2027target completion
Government Guidance Rate₹2,207/sq ydScale18 flatsAuthorityK-RERA
GURUVAYURMixed (Commercial & Residential)

Krishna Homes Kizhekkeppat Heritage

BALARAMAN K N

Feb 2023registered
Dec 2027target completion
Government Guidance Rate₹8,830/sq ydScale52 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.