HORIZON
Share

Blue Star CHSL

P51800045882 · MahaRERA · https://gethorizon.in/projects/blue-star-chsl-borivali-1nwil0w4

01

Complete project overview

MahaRERA · Registration filing
Project name
Blue Star CHSL
Units
38 units
Mix
23 × 2 BHK · 7 × 1 BHK · 6 × Shop · 2 × Office
Carpet area
12–83 sq mper-unit range, as filed
Floors
9
Parking
1 spaces
Land area
667 sq m
Sanctioned built-up
1,787 sq m

Timeline

RERA registeredJun 2022
Proposed completionMar 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

38 units across 18 batches
TypeArea sq mCount
Shop181
Shop221
1 BHK381
1 BHK384
Shop151
Shop121
2 BHK531
2 BHK533
Shop191
2 BHK606
2 BHK592
Shop221
Office831
1 BHK412
2 BHK651
2 BHK564
Office541
2 BHK546

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Thomas Joseph Vazhaparampil

IndividualPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2022–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Borivali
Taluka
Borivali
District
Mumbai Suburban
Pincode
400092
Survey no.
1019
North boundary
CTS NO 1017
East boundary
DP Road
South boundary
CTS NO 1021
West boundary
CTS NO 1018
What’s nearby
Schools1 school within 1km · College or university 1.6km away · Library 670m away
HealthcareHospital 45m away · 13 clinics within 1km · Doctor's clinic within 1km
LifestylePark 809m away · Gym or sports centre 1.5km away · 13+ restaurants and cafes within 1km
ShoppingSupermarket 1.2km away · Mall 664m away · Convenience store within 1km
Getting around
Expressway 1.4 km · Western Express HighwayPrimary road 421 m · Swami Vivekanand RoadRailway line 590 mRailway station 905m away (Borivali)5 bus stops within 500m
Water & environment
Water body 272 m · Veer Savarkar Udyan Pond
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. 1019

The promised possession date (31 Mar 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,960 residential projects still under way within 25 km. Step out ring by ring:

106 projects within 1 km — showing the nearest 6.

BorivaliMixed

GIIRNAR

MAHAVIR LAND DEVELOPER

Jul 2025registered
Dec 2029target completion
Scale48 flatsAuthorityMahaRERA
BorivaliOthers

SHREE VIGHNESHWAR CHS SRA

SHIVAM GROUP

Jun 2025registered
Dec 2028target completion
Scale49 flatsAuthorityMahaRERA
BorivaliResidential / Group Housing

Anmol Residency

B B ENTERPRISE

Feb 2024registered
Dec 2028target completion
Scale20 flatsAuthorityMahaRERA
BorivaliOthers

Paradigm Anantaara

Shubhyuvi Infrastructure LLP

Apr 2022registered
Dec 2030target completion
Scale224 flatsAuthorityMahaRERA
BorivaliResidential / Group Housing

Arham

DSD Realty

Aug 2025registered
Mar 2030target completion
Scale2 flatsAuthorityMahaRERA
BorivaliOthers

House of Shreeji Sharan

Miles Infra LLP

Feb 2024registered
Sep 2026target completion
Scale39 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.