This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
BRAMHA SKYCITY
Units
8 units
Mix
4 × 2 BHK · 4 × 3 BHK
Carpet area
66–88 sq mper-unit range, as filed
Floors
2
Land area
571 sq m
Sanctioned built-up
258 sq m
Recreational open space
5,119 sq m
Timeline
RERA registeredAug 2017
Proposed completionDec 2022
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
8 units across 6 batches
TypeArea sq mCount
2 BHK661
2 BHK661
3 BHK882
2 BHK661
2 BHK661
3 BHK842
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.6 kmPrimary road 634 m · Lohgaon RoadRailway line 4.8 kmRailway station 3.6km away (Ramwadi Station)Limited bus connectivity nearbyAirport 1.9km away
Water & environment
Water body 466 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
2 complaints · 2 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC005000000023105
8 Jul 2019
Order Approveddisposed
CC005000000023138
8 Jul 2019
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
3,218 residential projects still under way within 25 km. Step out ring by ring:
Of the 711 projects the radar draws within 6 km — every kind, every stage — 217 are residential projects still under way. This list keeps only those, and looks further out.
24 projects within 1 km — showing the nearest 6.
520 m awayResidential / Group Housing
Prasun Elara
Prasun Associates · LOHGAON · Haveli
2 yr 9 mo
Mar 2026registered
Dec 2028target completion
Government Guidance Rate₹70,954/sq ydScale49 flatsAuthorityMahaRERA