Complete project overview

K-RERA · Registration filing
Units
14 units
Mix
14 × 2BHK
Booked
2 of 14 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
779 sq m
Floor area
864 sq m
Description
Brook By Residency

Timeline

Project startedNov 2024
RERA registeredNov 2025
Proposed completionJun 2026
TodayJul 2026
Construction progress

86% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

12 of 14 available
TypeArea sq mAvailable
2BHK52212 of 14

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Prithviraj Palakkadavath

Kozhikode, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2025–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Chaliyath Road, West Manassery
Village
THAZHEKODE
Taluk
Kozhikode
District
Kozhikode
Pincode
673602
Survey no.
98/10/, 98/11
Patta no.
549
What’s nearby
SchoolsNearest school 1.9km away · College or university 786m away
HealthcareHospital 402m away · 1 clinic within 1km
LifestylePark 1.8km away
ShoppingSupermarket 1.6km away · Convenience store within 500m
Getting around
Primary road 2.7 km · Quilandy - Thamarassery - Edavanna RoadNo metro or railway within 5km3 bus stops within 500m
Water & environment
Water body 766 m · Mechery temple Kulam at MecheryRiver 2.3 km · Iruvazhinji River
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Mukkam Municipality

Municipality
approved 4 Oct 2024 · 1 yr ago
Building Permit no. BP/10952/2024Survey no. 98/10/, 98/11

The promised possession date (30 Jun 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BP/10952/2024 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Municipal Corporation / Municipality

A city corporation or municipality that sanctions building & development permits within its own limits. It has approved 871 RERA projects across 12 districts about 1 in 2 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.