Complete project overview

K-RERA · Registration filing
Units
36 units
Mix
22 × 3BHK · 13 × 2BHK · 1 × 1BHK
Booked
23 of 36 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,933 sq m
Floor area
5,589 sq m
Description
Cheloor Green Terrace

Timeline

RERA registeredJun 2023
Proposed completionJun 2030
TodayJul 2026
Construction progress

8% overall, as filed

Slabs of Super Structure0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Basement(s) and Plinth55%
Excavation60%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

13 of 36 available
TypeArea sq mAvailable
1BHK470 of 1
3BHK923 of 4
2BHK642 of 9
3BHK897 of 9
3BHK931 of 9
2BHK630 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Cheloor Property Development Projects Ltd

CompanyPromoter type
Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
2Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
89 homeson the public record across 2 projects
13,364 sq mbuilt-up filed
4,037 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Cheroor
Village
VILVATTOM
Taluk
Thrissur
District
Thrissur
Pincode
680008
Survey no.
Resurvey No. 72/41, 72/41-1, 72/42-1, 72/41-2
Patta no.
9661
What’s nearby
SchoolsNearest school 1.4km away · College or university 1.6km away · Library 1.6km away
HealthcareHospital 1.1km away · 2 clinics within 1km · Pharmacy within 1km
LifestylePark 899m away · Gym or sports centre 1.3km away · 10+ restaurants and cafes within 1km
ShoppingSupermarket 14m away · Mall 168m away · Convenience store within 500m
Getting around
Expressway 4.4 km · Salem - Kochi - Kanyakumari HighwayPrimary road 924 m · Kodungallur-Shornur RoadRailway line 1.4 kmRailway station 1.8km away (Punkunnam)Bus stop within 500m
Water & environment
Water body 51 mRiver 70 m · Puzhakkal River
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Thrissur Municipal Corporation

Municipal Corporation
approved 6 Sep 2018 · 7 yrs ago
Building Permit no. VPW1-BA(109547)/2018Survey no. Resurvey No. 72/41, 72/41-1, 72/42-1, 72/41-2
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan VPW1-BA(109547)/2018 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Thrissur Municipal Corporation

Municipal corporation / municipality

Has approved 91 RERA projectsabout 1 in 17 in Kerala.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
51
On record
5,515 flats · 15 plots
Since
2021

More apartment-heavy than Kerala overall — 99% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.