HORIZON
Share

COMMERCIAL BLOCK ,SHATABDIPURAM-2

P-GWL-17-1371 · RERA Madhya Pradesh · https://gethorizon.in/projects/commercial-block-shatabdipuram-2-gwalior-gird-uv0s53wy

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Project name
COMMERCIAL BLOCK ,SHATABDIPURAM-2
Plots
170 plots
Unit mix
170 × Plot
Revised completion
30 Sep 2021extended after an approved RERA extension
Extensions
2 approved · Covid19completion-date extension(s) granted by RERA
Quarterly reports
11 on file · latest Apr 2019 - Jun 2019quarterly progress certificates filed with RERA

Timeline

RERA registeredDec 2017
Project startedJan 2018
Proposed completionDec 2020
TodaySep 2026

Find your plot

Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.

170 plots across 1 batch
TypeArea sq mCount
Plot170

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Madhya Pradesh · Builder registration

GWALIOR DEVELOPMENT AUTHORITY

Government/Semi Government AgencyPromoter type
8Projects
1City
2017–2023Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
974 homes · 904 plotson the public record across 8 projects
₹1669123.95 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from GWALIOR DEVELOPMENT AUTHORITY— the full portfolio →

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Gwalior
Tehsil
Gwalior (Gird)
Planning area
Gwalior
Address
Commercial Block ,Shatabdipuram-2, Bhind Road, Gwalior.
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.6km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.1 kmPrimary road 690 mRailway line 3.3 kmRailway station 3.4km away (Birlanagar)Limited bus connectivity nearby
Water & environment
River 1.1 kmCanal 1.1 kmWater body 2.6 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹6.37 Cr declared to build 170 plots. What that works out to:

₹3.75 Lakhdeclared cost per plotall-in — land + construction
3%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹15,050per sq yd
₹18,000per sq m
Which rate
open plot, residential
Matched to
The rate published for “VESHALI HOUSING COOPERATIVE SOCIETY LIMITED GWALIOR MAHARAJPURA RAMANNA ROAD SE ANDAR”, 390 m from this project.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

AADARSH NAGAR,AADITYA VIHAR,AADITYAPURAM,RAMDAYAL NAGAR,JANAKPURI,R. J. PURAM₹22,000 / sq m₹18,395 / sq yd420 m
MAHARAJ PURA RAMNNA ROAD SE HATKAR₹18,000 / sq m₹15,050 / sq yd590 m
AASTHA NAGAR (JADERUA KALA)₹18,000 / sq m₹15,050 / sq yd790 m
GOLE KE MANDIR SE SURYA MANDIR JANE WALE ROAD PAR₹32,000 / sq m₹26,756 / sq yd810 m
BHIND ROAD, GOLE KA MANDIR SE DINDAYAL NAGAR TAK MAIN ROAD PAR₹72,000 / sq m₹60,201 / sq yd900 m

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Gwalior

Town & Country Planning (DTCP)
Layout Permit

The promised possession date (31 Dec 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Gwalior

Town & Country Planning area · Gwalior district

Has approved 96 RERA projects1.8% of Madhya Pradesh.

a mixed market65% apartments · 35% plotted layouts.

Builders
64
On record
11,667 flats · 7,490 plots
Reach
3 tehsils
Since
2017

More apartment-heavy than Madhya Pradesh overall — 65% apartments here vs 28% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

12 plotted projects still under way within 25 km. Step out ring by ring:

Of the 26 projects the radar draws within 6 km — every kind, every stage — 4 are plotted projects still under way. This list keeps only those, and looks further out.

1 project within 3 km — showing the nearest 1.

2.7 km awayPlotted Development

SATYAM AERO CITY PHASE-2

SATYAM BUILDERS · Morar

Oct 2025registered
Jun 2030target completion
Declared cost₹2.87 CrScale45 plotsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.