This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Units
33 units
Mix
33 × 2 BHK
Carpet area
52–68 sq mper-unit range, as filed
Floors
6
Buildings
2
Parking
36 spaces
Land area
1,547 sq m
Sanctioned built-up
3,111 sq m
Timeline
RERA registeredMar 2021
Proposed completionSep 2022
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
33 units across 3 batches
TypeArea sq mCount
2 BHK668
2 BHK5216
2 BHK689
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
1,902 homeson the public record across 12 projects
2,20,703 sq mbuilt-up filed
1,21,223 sq mland declared
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Maharashtra Housing and Area Development Authority (MHADA)Housing Authoritythis project4 of 5 projects
Mahad1 of 5 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 298 mPrimary road 2.0 km · Ring RoadMetro station 464m away (Lokmanya Nagar)Limited bus connectivity nearby
Water & environment
Water body 3.7 kmRiver 4.7 km · Nag River
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹32,065per sq yd
₹38,350per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 1 divisions of “Digdoh (Devi)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Maharashtra Housing and Area Development Authority (MHADA)
Housing Authority
Building Permit
Survey no. 112/2
The promised possession date (30 Sep 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Maharashtra Housing and Area Development Authority (MHADA)
Planning authority
Has approved 438 RERA projects — 2.2% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
341
On record
13,458 flats · 0 plots
Reach
18 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
442 residential projects still under way within 25 km. Step out ring by ring:
Of the 341 projects the radar draws within 6 km — every kind, every stage — 63 are residential projects still under way. This list keeps only those, and looks further out.
3 projects within 1 km — showing the nearest 3.
310 m awayResidential / Group Housing
PANDURANG RESIDENCY
PANDURANG DAULATRAO MATE · Nildoh · Hingna
2 yr 4 mo
Apr 2026registered
Aug 2028target completion
Government Guidance Rate₹19,766/sq ydScale35 flatsAuthorityMahaRERA