HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

DEVDATTA RESIDENCY

P53100031059 · MahaRERA · https://gethorizon.in/projects/devdatta-residency-sangli-miraj-kupwad-m-9w2ll1lr

01

Complete project overview

MahaRERA · Registration filing
Project name
DEVDATTA RESIDENCY
Units
21 units
Mix
9 × 2 BHK · 8 × 1 BHK · 4 × Shop
Carpet area
34–63 sq mper-unit range, as filed
Floors
9
Parking
1 spaces
Land area
532 sq m
Sanctioned built-up
1,571 sq m

Timeline

RERA registeredOct 2021
Proposed completionMar 2023
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

21 units across 3 batches
TypeArea sq mCount
Shop344
1 BHK478
2 BHK639

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Abhijit Vijaykumar Borgave

IndividualPromoter type
Sangli, MAHARASHTRABased in
5Projects
1City
2017–2023Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
86 homeson the public record across 5 projects
3,932 sq mbuilt-up filed
2,228 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Abhijit Vijaykumar Borgave— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 18 new projects last year
  • 440 nearby projects
1 km radius · coordinates as filed · 16.8524, 74.5815 · © OpenStreetMap contributors
Village
Sangli Miraj Kupwad (M Corp.)
Taluka
Miraj
District
Sangli
Pincode
416416
Survey no.
S NO 8/1/2/9/6 PLOT NO 6
North boundary
PLOT NO 4
East boundary
PLOT NO 7
South boundary
PLOT NO 9
West boundary
ROAD
What’s nearby
SchoolsNearest school 1.8km away
HealthcareHospital 115m away · 7 clinics within 1km
Lifestyle1 park within 500m · Gym or sports centre 1.0km away
ShoppingNo supermarket within 2km · ATM within 500m
Getting around
Expressway 211 m · Pushpraj ChowkPrimary road 1.1 km · Soni-Sangli RoadRailway line 942 mRailway station 973m away (Sangli)Limited bus connectivity nearby
Water & environment
Water body 565 m · Kali Khan
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

124 residential projects still under way within 25 km. Step out ring by ring:

Of the 440 projects the radar draws within 6 km — every kind, every stage — 78 are residential projects still under way. This list keeps only those, and looks further out.

13 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

KAUMUDI RESIDENCY

SATYAJIT GOVIND LELE · Sangli Miraj Kupwad · Miraj

Jan 2023registered
Dec 2026target completion
Scale12 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

SAI SONAI SAHANIVAS

VISHWA MALHAR CONSTRUCTION · Behind Resham Gathi mangal Kar… · Miraj

Apr 2023registered
Dec 2026target completion
Scale15 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Mayuresh Plaza

Mayuresh Vinayak alias Milind Tamhankar · Sangli Miraj Kupwad · Miraj

Mar 2023registered
Dec 2026target completion
Scale11 flatsAuthorityMahaRERA
10 m awayOthers

GIRNAR PARK

NIlesh Dnyaneshwar Khot · Sangli Miraj Kupwad · Miraj

May 2023registered
Dec 2026target completion
Scale25 flatsAuthorityMahaRERA
250 m awayResidential / Group Housing

SHREE KRUPA CITY

TATYASAHEB SAMBHAJI KHOT · Sangli Miraj Kupwad · Miraj

Aug 2024registered
Dec 2029target completion
Scale17 flatsAuthorityMahaRERA
320 m awayMixed

GOVIND GRAND

GKM ASSOCIATES · Sangli Miraj Kupwad · Miraj

Nov 2025registered
Aug 2030target completion
Scale39 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/devdatta-residency-sangli-miraj-kupwad-m-9w2ll1lr.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.