Registration for Residential Group Housing Development with 4 Blocks ; Block 1 – Basement Floor (Part) + Stilt Floor + 5 Floors with 67 Dwelling Units (Gymnasium , Indoor Games Room and Association Room in 1st Floor) , Block 2 – Basement Floor (Part) + Stilt Floor + 5 Floors with 70 Dwelling Units , Block 3 – Stilt Floor + 5 Floors with 40 Dwelling Units , Block 4 – Stilt Floor + 5 floors with 40 Dwelling Units and by totally 217 Dwelling Units at Shrudhi Sai Nagar Main Road , Madambakkam , Chennai. Comprised in Old S.Nos.771/1A , 771/2A , New S.No.771/2A1 of Madambakkam Village , Tambaram Taluk , Chengalpattu District.
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
CMDA (Chennai Metropolitan Development Authority)CMDA (Chennai Metropolitan Development Authority)this project5 of 8 projects
Panchayat / Local bodyPanchayat / Local body2 of 8 projects
Town & Country Planning (DTCP)Town & Country Planning (DTCP)1 of 8 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.7km away · College or university 1.3km away · Library 1.5km away
HealthcareHospital 856m away · 1 clinic within 1km · Pharmacy within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 471m away · Convenience store within 1km · Bank 954m away
Getting around
Expressway 5.0 km · Chennai Bypass LandingPrimary road 496 m · Camp RoadRailway line 3.6 kmRailway station 4.4km away (Tambaram)Bus stop within 1km
Water & environment
Water body 607 mCanal 1.1 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Tamil Nadu registration department
In Tamil Nadu it’s called the guideline value.
No government guidance rate is shown for this project.
Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
TNRERA · Approved building plan
CMDA (Chennai Metropolitan Development Authority)
CMDA (Chennai Metropolitan Development Authority)
Planning Permissionapproved 27 Aug 2024 · 2 yrs ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
CMDA (Chennai Metropolitan Development Authority)
Metropolitan development authority
Has approved 1,914 RERA projects — about 1 in 2 in Tamil Nadu, more than any other body in the state.
Builders
1,310
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. TNRERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to TNRERA
Litigation
None declared in this filing
Only what the builder declared, or what TNRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with TNRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
471 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 39 projects the radar draws within 6 km — every kind, every stage — 34 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.