El Tesoro Phase I
Timeline
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
More from VIANAAR HOMES PRIVATE LIMITED— the full portfolio →
In Goa it’s called the notified land rate.
No government guidance rate is shown for this project.
Goa notifies its land rates taluka by taluka, and this project doesn't name the ward or survey number the order prices — so no figure is shown rather than a neighbouring zone's.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (30 Nov 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
A Completion Certificateis on this project’s RERA record— the completion / legal-to-occupy sign-off that most RERA records simply don’t carry. It is issued by the planning authority, not by RERA. Still confirm it covers your specific unit before you rely on it.
Not published. RERA Goa doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Only what the builder declared, or what RERA Goa records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Goa, or that this register doesn’t publish it — never that nothing happened.
110 residential projects still under way within 25 km. Step out ring by ring:
2 projects within 1 km — showing the nearest 2.
ST ANTHONY CONSTRUCTIONS
UNA HOMES LLP
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.
What this record cannot tell you