The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.7km away · College or university 1.7km away
HealthcareHospital 1.2km away · 1 clinic within 1km
LifestylePark 1.2km away · 5 restaurants and cafes within 1km
ShoppingSupermarket 1.4km away
Getting around
Expressway 522 m · Katraj - Dehu Road BypassPrimary road 504 m · Aundh-Ravet RoadRailway line 2.4 km · Mumbai–Pune RailwayRailway station 2.5km away (Akurdi Railway Station)Limited bus connectivity nearby
Water & environment
River 717 m · Pavana RiverWater body 753 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹55,795per sq yd
₹66,730per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Punawale”.
In force
2026-2027 schedule
Spread
₹30,134 – ₹63,872 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation
A city municipal corporation that approves projects within its own limits. It has approved 12,653 RERA projects across 34 districts — about 1 in 2 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,979 residential projects still under way within 25 km. Step out ring by ring:
42 projects within 1 km — showing the nearest 6.
PunawaleResidential / Group Housing
F-Signature By Aishwaryam
Essen Land Marks, Esvee Dream Homes LLP
4 yr 2 mo
Apr 2026registered
Jun 2030target completion
Government Guidance Rate₹55,795/sq ydScale391 flatsAuthorityMahaRERA