HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
92 units
Mix
42 × 2BHK · 32 × 1BHK · 18 × 4BHK
Booked
91 of 92 filed sold/bookedas declared in the RERA filing
Buildings
2
Land area
3,996 sq m
Floor area
12,929 sq m
Description
FEZCO FREEZIA APARTMENTS

Timeline

Project startedJan 2010
RERA registeredNov 2021
Proposed completionMay 2026
TodayJul 2026
Construction progress

55% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps etc10%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc15%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc15%
Sanitary Fittings20%
Sanitary Fittings22%
Fire Fighting Fittings and Equipment25%
Electrical Fittings35%
Electrical Fittings40%
Fire Fighting Fittings and Equipment40%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings50%
The external plumbing and external plastering50%
The external plumbing and external plastering60%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings70%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
Completion of terraces floor each building100%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
Completion of terraces floor each building100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

16 of 92 available
TypeArea sq mAvailable
4BHK1219 of 18
1BHK300 of 32
2BHK617 of 42

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

FEZCO FREEZIA PRIVATE LIMITED

CompanyPromoter type
Kozhikode, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2021–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
PALAKKAL
Village
KODANCHERY
Taluk
THAMARASSERY
District
Kozhikode
Pincode
673586
Survey no.
15/6446,15/6953
Patta no.
10697
What’s nearby
SchoolsNearest school 1.2km away · College or university 1.4km away · Library 657m away
HealthcareHospital 209m away · Clinic within 2km
LifestyleNo parks within 2km · Gym or sports centre 1.1km away · 15+ restaurants and cafes within 1km
ShoppingSupermarket 257m away · Mall 818m away · Bank 61m away
Getting around
Expressway 65 m · Kozhikode Wayanad RoadPrimary road 230 m · Quilandy - Thamarassery - Edavanna RoadNo metro or railway within 5km4 bus stops within 500m
Water & environment
Water body 385 m · Kottayil Bhagahvadi KshethramkulamRiver 2.5 km · Cherupuzha
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Kodenchery Panjayath

Local body (LSGI)
approved 1 Sep 2025 · 10 mo ago
Building Permit no. A1-173/2020-21Survey no. 15/6446,15/6953

The promised possession date (18 May 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan A1-173/2020-21 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.