The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Taluka
Chavindra
District
Thane
Pincode
421601
Survey no.
CTS NO. 114
North boundary
Building
East boundary
Building
South boundary
Building
West boundary
Building
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 204m away · 3 clinics within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Bank 503m away
Getting around
Expressway 428 mPrimary road 2.8 kmRailway line 2.0 kmRailway station 2.5km away (Asangaon)Limited bus connectivity nearby
Water & environment
River 470 m · BhairangiCanal 906 m · Bhatsa Right Bank Canal
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation
A city municipal corporation that approves projects within its own limits. It has approved 12,653 RERA projects across 34 districts — about 1 in 2 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
126 residential projects still under way within 25 km. Step out ring by ring:
20 projects within 1 km — showing the nearest 6.
ShahapurOthers
BARADIA EKDANT
BARADIA REALTY
4 yr 11 mo
Aug 2021registered
Jul 2026target completion
Government Guidance Rate₹33,612/sq ydScale93 flatsAuthorityMahaRERA