These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Municipal Corporation of Greater MumbaiMunicipal Corporation4 of 5 projects
Slum Rehabilitation AuthoritySlum Rehabilitation Authoritythis project1 of 5 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
CTS NO 460A, 460A/7 to 92, 460A/103, 460A/106 to 214, 461, 461/1 to 11, 460/B/1B OF VILLAGE MALAD
North boundary
CTS 438 457 460 B 1 pt 460 B 2pt
East boundary
Road
South boundary
CTS NO 470
West boundary
CTS 437 463 464 466 467
What’s nearby
Schools1 school within 500m · 4 educational institutions within 1km · College or university 1.4km away
HealthcareHospital 280m away · 7 clinics within 1km
Lifestyle1 park within 500m · Gym or sports centre 614m away · 4 restaurants and cafes within 1km
ShoppingSupermarket 1.4km away · Mall 506m away
Getting around
Expressway 20 m · Western Express HighwayPrimary road 1.2 km · Swami Vivekanand RoadRailway line 1.0 km · Western Railway Virar to BorivaliMetro station 201m away (Kurar)Limited bus connectivity nearby
Water & environment
Water body 69 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilitation Authority
Slum Rehabilitation Authority
Building Permit
Survey no. CTS NO 460A, 460A/7 to 92, 460A/103, 460A/106 to 214, 461, 461/1 to 11, 460/B/1B OF VILLAGE MALAD
The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilitation Authority
Planning authority
Has approved 729 RERA projects — 3.6% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.