HORIZON
Share

GILANI TOWER

BRERAP000710-2/903/R-983/2020 · RERA Bihar · https://gethorizon.in/projects/gilani-tower-patna-sadar-a1twacxm

01

Complete project overview

RERA Bihar · Registration filing
Project name
GILANI TOWER
Units
18 units
Unit mix
12 × 3 BHK · 6 × 2 BHK
Parking
36 spaces
Land area
580 sq m
Built-up area
1,449 sq m

Timeline

Project startedMar 2019
RERA registeredJun 2020
Proposed completionMar 2023
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

18 units across 2 batches
BuildingTypeArea sq mCount
GILANI TOWER2 BHK1306
GILANI TOWER3 BHK23912

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

TAMEER ENGINEERS PRIVATE LIMITED

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
2Projects
1Cities
2019–2023Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
42 homeson the public record across 2 projects
3,078 sq mbuilt-up filed
1,368 sq mland declared
₹10.32 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from TAMEER ENGINEERS PRIVATE LIMITED— the full portfolio →

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
Anchal (block)
Patna Sadar
Mauja (revenue village)
Ranipur
Address
HUSSAINPUR, PHULWARI SHARIF
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 92m away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 377 mPrimary road 395 mRailway line 1.2 kmRailway station 1.9km away (Phulwari Sharif)Limited bus connectivity nearby
Water & environment
Canal 149 mWater body 1.1 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹5.92 Cr declared to build 18 flats. What that works out to:

₹32.89 Lakhdeclared cost per flatall-in — land + construction
₹3,795/sq ftof built-up area₹40,849/sq m
19%of the cost is land₹1,826/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹5,372per sq yd
₹6,425per sq m
Which rate
residential land — the lowest of this village's entries
Matched to
The rate published for the village of “Ranipur”.
Spread
₹5,372₹20,083 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (30 Mar 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

368 residential projects still under way within 25 km. Step out ring by ring:

7 projects within 1 km — showing the nearest 6.

DanapurResidential/Group Housing

Shyam Shashi Heritage

DHARMENDRA SHASI CONSTRUCTION COMPANY PRIVATE LIMITED

Sep 2025registered
Feb 2029target completion
Declared cost₹3.10 CrScale16 flatsAuthorityRERA Bihar
ISHOPURResidential/Group Housing

MANNAT ENCLAVE

ARISTONE HOMES PRIVATE LIMITED

Sep 2021registered
Mar 2026target completion
Declared cost₹4.70 CrScale28 flatsAuthorityRERA Bihar
Phulwari SarifResidential/Group Housing

SAI HERITAGE PHASE 3

NAGAREE BUILDERS&DEVELOPERS PRIVATE LIMITED

Apr 2022registered
Dec 2026target completion
Declared cost₹7.50 CrScale53 flatsAuthorityRERA Bihar
PatnaResidential

ALLAMA ENCLAVE

PEACE S SQUARE BUILDTECH

Jul 2023registered
Jun 2027target completion
Declared cost₹9.34 CrAuthorityRERA Bihar
PatnaResidential

YAMUNA RESIDENCY

Trishul Classicon Private Limited

Apr 2024registered
Oct 2028target completion
Declared cost₹4.62 CrAuthorityRERA Bihar
Phulwari SarifMixed Development(residential and commercial)

Abeer Heights

Kumar Heights Venture Pvt. Ltd.

Aug 2026registered
Sep 2030target completion
Declared cost₹22.50 CrAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.