Complete project overview

K-RERA · Registration filing
Units
43 units
Mix
25 × 3BHK · 14 × 2BHK · 4 × 1BHK
Booked
37 of 43 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,777 sq m
Floor area
5,922 sq m
Description
Glenwood

Timeline

Project startedJun 2022
RERA registeredSep 2022
Proposed completionJul 2027
TodayJul 2026
Construction progress

23% overall, as filed

Sanitary Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings1%
Slabs of Super Structure44%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

6 of 43 available
TypeArea sq mAvailable
1BHK501 of 2
2BHK753 of 14
3BHK990 of 11
1BHK491 of 2
3BHK1231 of 14

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Mesco Realtors LLP

Limited Liability PartnershipPromoter type
Kozhikode, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Kottaram Road
Village
KACHERY
Taluk
Kozhikode
District
Kozhikode
Pincode
673006
Survey no.
Survey No 393, 394/2
Patta no.
3597
What’s nearby
Schools4 schools within 500m · 20 educational institutions within 1km · College or university 648m away
HealthcareHospital 301m away · 4 clinics within 1km · Pharmacy within 500m
LifestylePark 765m away · 23+ restaurants and cafes within 1km · Swimming pool within 2km
ShoppingSupermarket 356m away · Mall 330m away · Bank 79m away
Getting around
Expressway 2.9 km · Kannur-Calicut-Valanchery HighwayPrimary road 164 m · Wayanad RoadRailway line 1.1 kmRailway station 900m away (Vellayil)5 bus stops within 500m
Water & environment
Water body 711 m · Temple Pond
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Kozhikode Municipal Corporation

Municipal Corporation
approved 20 Jun 2022 · 4 yrs ago
Building Permit no. TP9/84941/2021Survey no. Survey No 393, 394/2
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan TP9/84941/2021 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Kozhikode Municipal Corporation

Municipal corporation / municipality

Has approved 57 RERA projects3.7% of Kerala.

an apartments market96% apartments · 4% plotted layouts. Apartments like yours are this body's core business.

Builders
36
On record
3,822 flats · 80 plots
Since
2021

More apartment-heavy than Kerala overall — 96% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.