HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

GOVIND AVENUE

P51600048562 · MahaRERA · https://gethorizon.in/projects/govind-avenue-nashik-m-corp-yhu5sldc

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Floors
7
Parking
6 spaces
Land area
382 sq m
Sanctioned built-up
1,236 sq m

Timeline

RERA registeredJan 2023
Proposed completionNov 2025
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

MANOJ PRAKASH PAWAR

IndividualPromoter type
Nashik, MAHARASHTRABased in
1Projects
1City
2023–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 71 new projects last year
  • 1,067 nearby projects
1 km radius · coordinates as filed · 20.0236, 73.8363 · © OpenStreetMap contributors
Village
Nashik (M Corp.)
Taluka
Nashik
District
Nashik
Pincode
422003
Survey no.
S NO.241/2/A/1, PLOT NO. 33
North boundary
COLONY ROAD 9 MTR
East boundary
PLOT 32
South boundary
PLOT 27
West boundary
PLOT 34
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 599m away · 2 clinics within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.4 km · Agra Mumbai RoadPrimary road 368 mNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Canal 1.2 kmWater body 1.4 km
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

A building already stood within ~20 m of the recorded location in 2016 — before this project started in 2023. The yearly view ends in 2023, so it does not cover this project's own construction; see the 2026 image.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.

Satellite photographs of the same ground

Apr 2017
Feb 2023
Jan 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2016.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
  • Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • Coordinate sits 3-10 km from other projects with the same pincode.
  • The yearly site view ends in 2023, before this project started in 2023.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹26,672per sq yd
₹31,900per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 40 divisions of “Nashik (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹22,074₹70,912 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
07

Other projects nearby

The register · within 25 km

1,073 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,067 projects the radar draws within 6 km — every kind, every stage — 365 are residential projects still under way. This list keeps only those, and looks further out.

30 projects within 1 km — showing the nearest 6.

80 m awayOthers

VIHAN GALAXY

SHREE UMA BUILDCON · Nashik

Jan 2023registered
Mar 2026target completion
Government Guidance Rate₹26,672/sq ydScale35 flatsAuthorityMahaRERA
140 m awayResidential / Group Housing

AYODHYA PARK

AYODHYA INFRA · Nashik

Sep 2026registered
Mar 2029target completion
Government Guidance Rate₹26,213/sq ydScale33 flatsAuthorityMahaRERA
210 m awayResidential / Group Housing

SAMRUDDHI PARK

DG INFRA · Nashik

Oct 2021registered
Mar 2026target completion
Government Guidance Rate₹26,672/sq ydAuthorityMahaRERA
530 m awayOthers

THE RISING

VISHAL KRISHNADEO DESALE · CHEHEDI BK · Nashik

Oct 2023registered
Aug 2028target completion
Government Guidance Rate₹25,109/sq ydScale71 flatsAuthorityMahaRERA
640 m awayResidential / Group Housing

Vastu Aaradhya

Vasturacheta Buildcon · Nashik

Dec 2025registered
May 2028target completion
Government Guidance Rate₹26,672/sq ydScale28 flatsAuthorityMahaRERA
670 m awayOthers

IMPERIAL TOWER

BIJASANI BUILDTECH · Nashik

Feb 2024registered
Dec 2028target completion
Government Guidance Rate₹26,672/sq ydScale102 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/govind-avenue-nashik-m-corp-yhu5sldc.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.