Complete project overview

K-RERA · Registration filing
Units
16 units
Mix
8 × 2BHK · 8 × 3BHK
Booked
7 of 16 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
728 sq m
Floor area
1,955 sq m
Description
GOVIND SUITE

Timeline

Project startedMar 2022
RERA registeredOct 2022
Proposed completionOct 2026
TodayJul 2026
Construction progress

44% overall, as filed

Sanitary Fittings0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Electrical Fittings40%
Excavation45%
Staircases, Lifts Wells45%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc45%
Stilt Floor55%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings55%
Overhead and Underground Water Tanks.65%
The external plumbing and external plastering80%
Slabs of Super Structure92%
Completion of terraces floor each building92%
Basement(s) and Plinth93%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

9 of 16 available
TypeArea sq mAvailable
2BHK622 of 4
3BHK802 of 2
3BHK831 of 2
3BHK851 of 2
3BHK801 of 2
2BHK632 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

VAILOPPILLY SAJI GOVIND

Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
1Projects
1Cities
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
AYYANTHOLE
Village
AYYANTHOLE
Taluk
Thrissur
District
Thrissur
Pincode
680003
Survey no.
1217/3-18
Patta no.
8945
What’s nearby
Schools2 schools within 1km · 4 educational institutions within 1km · Library 597m away
HealthcareHospital 477m away · 1 clinic within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Playground within 500m · Gym or sports centre 637m away
ShoppingSupermarket 644m away · Mall 427m away · Convenience store within 500m
Getting around
Primary road 502 m · Thrissur - Kanjani - Vadanappally RoadRailway line 1.5 kmRailway station 1.8km away (Thrissur)2 bus stops within 500m
Water & environment
Water body 59 m · Thrikkumadamkudam Ambalakulam
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Thrissur Municipal Corporation

Municipal Corporation
approved 20 Oct 2021 · 4 yrs ago
Building Permit no. AYL/BA/341/2020-21Survey no. 1217/3-18
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan AYL/BA/341/2020-21 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Thrissur Municipal Corporation

Municipal corporation / municipality

Has approved 91 RERA projectsabout 1 in 17 in Kerala.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
51
On record
5,515 flats · 15 plots
Since
2021

More apartment-heavy than Kerala overall — 99% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.