GUJANS PARIPALANA PHASE - V EXTENSION

TNRERA/11/BLG/0285/2026 · TNRERA · https://gethorizon.in/projects/gujans-paripalana-phase-v-extension-19fiaoib

01

Complete project overview

TNRERA · Registration filing
Description
Registration for Residential apartment Building (Block 1 to 4) Block -1 – Stilt + 5 Floors with 40 dwelling units, Block -2 – Stilt + 5 Floors with 30 dwelling units, Block -3 – Stilt + 5 Floors with 30 dwelling units, Block -4 – Stilt + 5 Floors with 30 dwelling units (Totally 130 dwelling units) Comprised in SF.NO. 402/1B2A1 of Vedapatty Village and Town Panchayat, Perur Taluk, Coimbatore District.
Registration no.
TNRERA/11/BLG/0285/2026

Timeline

RERA registeredAug 2026
Proposed completionMay 2034
TodaySep 2026
02

Builder’s track record

TNRERA · Builder registration

M/S SRI VEERAMATHIAMMAN INFRA DEVELOPER PRIVATE LIMITED

M/S SRI VEERAMATHIAMMAN INFRA DEVELOPER PRIVATE LIMITEDPromoter
1Projects
1Cities
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

TNRERA · Registration filing
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 3.3km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 271 m · Coimbatore - Thondamuthur - Narasipuram RoadNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 2.9 km · NoyyalWater body 3.5 km · Krishnampathi Lake
distances only — not a flood assessment
04

Government Guidance Rate

Tamil Nadu registration department

In Tamil Nadu it’s called the guideline value.

No government guidance rate is shown for this project.

Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

TNRERA · Approved building plan

Town & Country Planning (DTCP)

Town & Country Planning (DTCP)
approved 21 Aug 2026 · 1 mo ago
Planning Permission no. 425/2026
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan 425/2026 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Town & Country Planning (DTCP)

Town & country planning

Has approved 756 RERA projectsabout 1 in 5 in Tamil Nadu.

Builders
467
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by TNRERA

07

Other projects nearby

The register · within 25 km

119 residential and mixed-use projects still under way within 25 km. Step out ring by ring:

Of the 19 projects the radar draws within 6 km — every kind, every stage — 18 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.

2 projects within 1 km — showing the nearest 2.

100 m away

GUJANS PARIPALANA PHASE V

SRI GUJAN BUILDER AND DEVELOPERS

Aug 2026registered
Jun 2034target completion
AuthorityTNRERA
430 m away

M/s.Gujan's Paripalana Phase III Annexe

Veeramathiamman Infra Developers Pvt Ltd managing Director S.Kumar

Jun 2025registered
Jun 2029target completion
AuthorityTNRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — TNRERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — TNRERA does not publish a complaints register. This read cannot speak to them either way.
  • Escrow — TNRERA does not publish escrow declarations. Whether buyer money is ring-fenced cannot be read here.