HORIZON
Share

GV7 INSIGNIA BUILDING B AND C

P52100080265 · MahaRERA · https://gethorizon.in/projects/gv7-insignia-building-b-and-c-ambegaon-bk-haveli-3tbmaftn

01

Complete project overview

MahaRERA · Registration filing
Project name
GV7 INSIGNIA BUILDING B AND C
Units
118 units
Floors
18
Buildings
4
Parking
274 spaces
Land area
10,893 sq m
Sanctioned built-up
13,830 sq m
Recreational open space
1,022 sq m

Timeline

RERA registeredMay 2025
Proposed completionDec 2029
TodaySep 2026
Construction progress
Podiums0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
Aggregate area of …0%
Open Parking0%
Superstructure20%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

M/S CHIRAG DEVELOPERS

PartnershipPromoter type
Pune, MAHARASHTRABased in
1Projects
1City
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
AMBEGAON Bk
Taluka
Haveli
District
Pune
Pincode
411046
Survey no.
SURVEY NO. 3/1 TO 4/1/4/1, 3/1 TO 4/1/4/2, 3/1 TO 4/1/4/2/2, 3/1 TO 4/1/4/2/3, 3/1 TO 4/1/4/4, 3/1 TO 4/1/4/5
North boundary
BY BUILDING A OF THE SAME PROJECT
East boundary
BY 12 MT WIDE INTERNAL ROAD
South boundary
BY AMENITY SPACE
West boundary
BY OPEN SPACE TO AND ADJ S NO 3
What’s nearby
Schools1 school within 500m · College or university 1.5km away · Library 990m away
HealthcareHospital 612m away · 2 clinics within 1km
LifestylePark 1.7km away · Gym or sports centre 323m away · 8 restaurants and cafes within 1km
ShoppingSupermarket 522m away
Getting around
Expressway 54 mPrimary road 1.7 km · Narveer Tanaji Malusare MargNo metro or railway within 5km3 bus stops within 500m
Water & environment
Water body 1.6 kmCanal 1.6 km · Mutha Right Bank Canal
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹54,064per sq yd
₹64,660per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “AMBEGAON Bk”.
In force
2026-2027 schedule
Spread
₹28,052₹62,450 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Pune Municipal Corporation

Municipal Corporation
Building Permit
Survey no. SURVEY NO. 3/1 TO 4/1/4/1, 3/1 TO 4/1/4/2, 3/1 TO 4/1/4/2/2, 3/1 TO 4/1/4/2/3, 3/1 TO 4/1/4/4, 3/1 TO 4/1/4/5
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Pune Municipal Corporation

Municipal corporation

Has approved 1,863 RERA projectsabout 1 in 11 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
1,351
On record
9,749 flats · 439 plots
Reach
3 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,006 residential projects still under way within 25 km. Step out ring by ring:

26 projects within 1 km — showing the nearest 6.

PuneResidential / Group Housing

LAXMI GREENS

DARSHEEL BUILDCON

Dec 2023registered
Jun 2030target completion
Government Guidance Rate₹58,077/sq ydScale153 flatsAuthorityMahaRERA
AMBEGAON BkResidential / Group Housing

BASIL VRUNDAVAN WING E

BASIL PROMOTERS LLP

May 2024registered
Apr 2028target completion
Government Guidance Rate₹54,064/sq ydScale142 flatsAuthorityMahaRERA
AMBEGAON BKResidential / Group Housing

UNIQUE RESIDENCY

UNIQUE DEVELOPRS

Apr 2025registered
Dec 2027target completion
AuthorityMahaRERA
AMBEGAON KHResidential / Group Housing

Parijaat

GKC Buildcon LLP

Dec 2023registered
Jul 2026target completion
Government Guidance Rate₹42,902/sq ydScale56 flatsAuthorityMahaRERA
AMBEGAON BkOthers

BASIL SHIVRAJ

SHREE SADGURU DEVELOPERS

May 2024registered
Dec 2027target completion
Government Guidance Rate₹54,064/sq ydScale138 flatsAuthorityMahaRERA
PuneResidential / Group Housing

SUMEDHRAJ HILL VIEW

SHRIKRISHNA DEVELOPERS

Jan 2025registered
Nov 2027target completion
Government Guidance Rate₹58,077/sq ydScale23 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.