HORIZON
Share

Haze Munnar

T1/OL/051/2025 · K-RERA · https://gethorizon.in/projects/haze-munnar-kunjithanny-idukki-fvbh3lw3

01

Complete project overview

K-RERA · Registration filing
Plots
9 plots
Mix
9 × Bangalow / Villas
Buildings
9
Land area
2,780 sq m
Floor area
1,571 sq m
Description
Haze Munnar

Timeline

Project startedApr 2025
RERA registeredMay 2025
Proposed completionDec 2029
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

9 of 9 available
TypeArea sq mAvailable
Bangalow / Villas1388 of 8
Bangalow / Villas691 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

Aakriti Holdings

PartnershipPromoter type
Idukki, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Etticity, Kumminikunnu
Village
KUNJITHANNY
Taluk
DEVIKULAM
District
Idukki
Pincode
685565
Survey no.
Re Sy 131/7, 131/7-1, 131/7-10, 131/7-11, 131/7-13, 131/7-12, 131/7-4, 131/7-5, 135/6-5, 135/6-8
Patta no.
4501, 4587, 4804, 4513, 4512, 4805, 4768,4490
What’s nearby
SchoolsNearest school 1.0km away · Library 1.9km away
HealthcareNearest hospital 4.1km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Convenience store within 1km
Getting around
Expressway 3.7 km · Kochi - Dhanushkodi RoadPrimary road 209 m · Hill HighwayNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 327 m · MudirapuzhaWater body 329 m
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹245per sq yd
₹293per sq m
Which rate
Residential Plot without vehicular access
Matched to
The value published for this project's own survey number, in “Kunjithanni”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Vellathooval Grama Panchayat Idukki

Local body (LSGI)
approved 18 May 2023 · 3 yrs ago
Layout Permit no. A4-BA(173225)/2023Survey no. Re Sy 131/7, 131/7-1, 131/7-10, 131/7-11, 131/7-13, 131/7-12, 131/7-4, 131/7-5, 135/6-5, 135/6-8
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan A4-BA(173225)/2023 on the approving authority’s portal to confirm the approval.

The approving body, at scale

The local self-government (LSGI)

The local body that approved this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within Idukki

One plotted project still under way within Idukki. The nearest 1:

42.9 km awayPlots

Valley View

Jomy George · ELAPPARA

Sep 2025registered
Dec 2026target completion
Government Guidance Rate₹104/sq ydAuthorityK-RERA

Projects within Idukki, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.