1 extension on record — latest to 31 Jul 2025declared reason: other than force majeure
Description
Site plan attached with lease deed issued by Jaipur Development Authority on 24.06.2016 states area as 6344.48-4.5(-R)= 6339.98 sq. mtrs. In approved map of
stilt floor, two wheeler parking is mentioned as 38 (open + covered) I.e 33 in open
and 5 in covered. Thus we have mentioned 5 two wheeler covered parking in stilt and
33 two wheeler parking in open. Earlier we have mentioned Block area as per sanctioned map I.e. 24299.01 sq mtrs as built up area in online summary sheet of said project however now corrected gross built up area has been updated in the online summary sheet as 24250.99sq mtrs as per copy on sanctioned layout
Timeline
Construction startApr 2021
RERA registeredApr 2021
Proposed completionDec 2024
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
76 units across 15 batches
BuildingTypeArea sq mCount
IMPERIAL GARDEN4 BHK+4T+SERVANT RM1797
IMPERIAL GARDEN4 BHK+4T+SERVANT RM.1777
IMPERIAL GARDEN5 BHK+5T+SERVANT RM.2207
IMPERIAL GARDEN3 BHK+3T+SERVANT RM1237
IMPERIAL GARDEN3 BHK+3T+SERVANT RM1357
IMPERIAL GARDEN4 BHK+4T+SERVANT RM1877
IMPERIAL GARDEN4 BHK+4T+SERVANT RM.1847
IMPERIAL GARDENShop411
IMPERIAL GARDEN5 BHK+5T+SERVANT RM2697
IMPERIAL GARDEN3 BHK+3T+SERVANT RM.1387
IMPERIAL GARDEN4 BHK+4T+SERVANT RM.1637
IMPERIAL GARDENShop261
IMPERIAL GARDENShop321
IMPERIAL GARDENShop282
IMPERIAL GARDENShop191
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 2.2 kmPrimary road 265 m · Sikar RoadRailway line 2.4 kmRailway station 2.9km away (Dahar-Ka-Balaji)4 bus stops within 500m
Water & environment
Water body 747 m · ghodela bulding material
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹90.00 Cr declared to build 76 flats. What that works out to:
₹1.18 Crdeclared cost per flatall-in — land + construction
₹3,446/sq ftof built-up area₹37,095/sq m
56%of the cost is land₹7,327/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 22 Apr 2021 · 5 yrs ago
The promised possession date (31 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
406 residential projects still under way within 25 km. Step out ring by ring: