3 extensions on record — latest to 31 Mar 2026declared reason: force majeure
Description
1. Revised maps with consequent changes along with Form G updated on 20.01.2021. This bears the approval of Honorable Chairman sir. As per proposed updation Phase area of the project changed to 13027.69 sq.mt. from 26067.92 sq.mt.and should be readable as 13027.69 sq.mt. Revised Building plans and approval letter dated 18.09.2019 updated in "Building Sanction Plan" tab of "Building Document" column.
2. The project PhaseArea has been changed on 12 Feb, 2021 from "26,067.92 " to "13,027.69" as per the email received from RERA on 12 Feb, 2021.
As per applicant application, to update other promoter details and further to the approval of Hon'ble Chairman on 24.03.2021, other promoter details has been changed as Deeapk Mor POA Holder of Kailash Chandra Sharma, Geeta Sharma and Kanta Sharma, and Power of Attorney in Favour of Deepak Mor have also been uploaded under the online Tab of Copy Of Legal Title Report. The other promoter details have been updated on 25.03.2021.
Timeline
Construction startApr 2017
RERA registeredSep 2017
Proposed completionMar 2022
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
576 units across 2 batches
BuildingTypeArea sq mCount
SHYAM APARTMENT2 BHK (LIG)40282
SHYAM APARTMENT1 BHK (EWS)25294
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 1.5 km · FlyoverPrimary road 48 m · Jaipur RoadRailway line 3.3 kmRailway station 3.7km away (Dahar-Ka-Balaji)4 bus stops within 500m
Water & environment
Water body 640 m · ghodela bulding material
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹53.61 Cr declared to build 576 flats. What that works out to:
₹9.31 Lakhdeclared cost per flatall-in — land + construction
₹1,860/sq ftof built-up area₹20,024/sq m
24%of the cost is land₹467/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹6,689per sq yd
₹8,000per sq m
Which rate
residential, interior plot
Matched to
The rate published for “RAJAWAS”.
Highest rate
₹10,234 per sq yd — the top road-facing rate among the residential rates published for this colony
By the road it faces
interior plot
₹8,000 / sq m
₹6,689 / sq yd
road-facing
₹10,200 / sq m
₹8,528 / sq yd
41–60 ft road
₹11,220 / sq m
₹9,381 / sq yd
61–99 ft road
₹11,730 / sq m
₹9,808 / sq yd
100 ft+ road
₹12,240 / sq m
₹10,234 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this colony.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 13 Sep 2017 · 9 yrs ago
The promised possession date (31 Mar 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
399 residential projects still under way within 25 km. Step out ring by ring:
Of the 99 projects the radar draws within 6 km — every kind, every stage — 33 are residential projects still under way. This list keeps only those, and looks further out.