Complete project overview

RAJ-RERA · Registration filing
Land area
42,287 sq m
Description
1. M/s Amar Adeshwar Infrastructure is proposing to develop an affordable housing project (EWS/LIG) namely "Indraprasth" under the Mukhya Mantri Jan Awaas Yojna 2015. This is a new project and is proposed to be developed in Jodhpur. As per the guidelines of CMJAY 2015 IN UDH notification dated 3rd April 2017, the timeline of completion of (EWS/LIG) component of projects proposed under the provisions Clause 4A in General Conditions are within time limits stipulated in the above said notification OR as per CMJAY 2015,the Note in provisions of Clause 4A time taken by any Government Agency in issuing required certificate/approval will be deducted from the total construction period. Promoter reserves the right to develop more flats based on the incentive BAR available and extension/sanction and approvals for higher floor for more number of units whichever is applicable and as per CMJAY guidelines/rules in this regard on this land. This project is approved by empanelled architect Mr. Sunil Mahur under provisions of 3A of CMJAY 2015 as per UDH circular dated 31 May 2017. Applicable fee submitted in Jodhpur Development Authority. The total Project land area is 42286.59 and total Phase-5 area of Land is 4992.15 Sqr Mtrs. Presently we have approval of G+11 Floor (Ground Floor + 2 Podium + 9 Residential Floor)and Approx Height is 37.75 Mtr.).All the drawings has been uploaded (all set of approved drawings)in following manner,(site plan,stilt plan,floor 1 plan) in building layout plan and (2,3,4,5,6,7,8,9 floor plan+terrace plan) in architectural drawings and (front elevation,section,right left elevation,back elevation) in structural drawing due to space constraint.The finish date committed for the project as per Form"B" is 03/12/2021,which is beyond the validity period of the approved maps.The promoter takes the responsibility to obtain the necessary extension from the competent authority. 2. The project status has been changed on 27 Jan, 2021 from "New Project" to "On-going Project" as per the email received from RERA on 27 Jan, 2021.

Timeline

RERA registeredApr 2021
Proposed completionDec 2021
TodayJul 2026
02

Builder’s track record

RAJ-RERA · Promoter registration

Amar Adeshwar Infrastructure

OrganisationPromoter type
Jodhpur, RajasthanBased in
6Projects
1City
2018–2021Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
6 projectson the public record across 6 projects
2,77,451 sq mbuilt-up filed
2,08,790 sq mland declared
₹435.01 Crdeclared build cost

Build cost is what the promoter declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RAJ-RERA · Registration filing
Address
Total Patta(209/2,215/1,215/2,237/1,216/1),Phase 5(216/1), JAISALMER JAIPUR BYPASS,OPP NEW HIGH COURT, JODHPUR, Jodhpur, Jodhpur, 342005
Village
JODHPUR
Taluka
Jodhpur
District
Jodhpur
Pincode
342005
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.5km away
LifestyleNo parks within 2km
ShoppingSupermarket 1.9km away
Getting around
Expressway 282 m · Jodhpur BypassPrimary road 3.5 kmRailway line 3.9 kmRailway station 3.9km away (Basni)Limited bus connectivity nearby
Water & environment
River 1.4 km · Jojari
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹60.03 Cr declared. What that works out to:

3%of the cost is land

This is what the promoter filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Planning authority

RAJ-RERA · Approved building plan
Building Permitapproved 1 Apr 2021 · 5 yrs ago

The promised possession date (3 Dec 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RAJ-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RAJ-RERA does not publish a complaints register. This read cannot speak to them either way.