HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
9 units
Mix
8 × 2BHK · 1 × 1BHK
Booked
4 of 9 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
346 sq m
Floor area
833 sq m
Description
Inspire Capita

Timeline

Project startedOct 2023
RERA registeredApr 2024
Proposed completionOct 2026
TodayJul 2026
Construction progress

27% overall, as filed

The external plumbing and external plastering0%
Fire Fighting Fittings and Equipment0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Overhead and Underground Water Tanks.10%
Electrical Fittings12%
Sanitary Fittings15%
Completion of terraces floor each building15%
Installation of lifts, water pumps etc15%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc15%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings45%
Staircases, Lifts Wells50%
Excavation100%
Slabs of Super Structure100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

5 of 9 available
TypeArea sq mAvailable
1BHK290 of 1
2BHK552 of 4
2BHK553 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

M/s Inspire Homes Engineers & Realtors Pvt Ltd

CompanyPromoter type
Ernakulam, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2024–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Dairy methanam road
Village
THRIKKAKARA NORTH
Taluk
Kanayannur
District
Ernakulam
Pincode
682024
Survey no.
Re Sy 84/24
Patta no.
40711
What’s nearby
Schools1 school within 1km · College or university 2.0km away · Library 516m away
HealthcareHospital 483m away · 4 clinics within 1km · Pharmacy within 500m
LifestylePark 1.3km away · Gym or sports centre 955m away · 29+ restaurants and cafes within 1km
ShoppingSupermarket 514m away · Mall 713m away · Bank 349m away
Getting around
Expressway 341 m · Salem - Kochi - Kanyakumari HighwayPrimary road 900 m · Edapally OverbridgeRailway line 261 mMetro station 375m away (Pathadipalam)3 bus stops within 500m
Water & environment
Canal 775 m · Chithrapuzha
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Kalamassery Municipality

Municipality
approved 19 Sep 2023 · 2 yrs ago
Building Permit no. BA-112/2023Survey no. Re Sy 84/24
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BA-112/2023 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Kalamassery Municipality

Municipal corporation / municipality

Has approved 11 RERA projects0.7% of Kerala.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
11
On record
509 flats · 0 plots
Since
2021

More apartment-heavy than Kerala overall — 100% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.